{"id":16,"date":"2010-11-17T14:03:59","date_gmt":"2010-11-17T14:03:59","guid":{"rendered":"https:\/\/sudbury.ma.us\/building\/2010\/11\/17\/addendum-1-floor-tile-replacement-fairbank-center\/"},"modified":"2010-11-17T14:03:59","modified_gmt":"2010-11-17T14:03:59","slug":"addendum-1-floor-tile-replacement-fairbank-center","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/building\/2010\/11\/17\/addendum-1-floor-tile-replacement-fairbank-center\/","title":{"rendered":"Addendum 1 &#8211; Floor Tile Replacement Fairbank Center"},"content":{"rendered":"<p>\n\t&nbsp;<\/p>\n<p align=\"center\">\n\t<strong>INVITATION TO BID<\/strong><\/p>\n<p align=\"center\">\n\t<strong>Floor Tile Replacement, Including Removal of Asbestos-Containing Existing Tile <\/strong><\/p>\n<p align=\"center\">\n\t&nbsp;Fairbank Community Center<\/p>\n<p align=\"center\">\n\t40 Fairbank Road, Sudbury, MA 01776<\/p>\n<p>\n\t<strong>ADDENDUM NO. 1<\/strong><\/p>\n<p>\n\t&nbsp;I.&nbsp; The contract documents are changed as follows:<\/p>\n<p>\n\t&nbsp;All references to the inclusion of the Asbestos Abatement Project Monitor and clearance sampling in the bid documents, wherever found, are hereby deleted and shall be disregarded by the contractor.&nbsp; &nbsp;Asbestos abatement monitoring and clearance sampling will be performed by the Owner and the cost for these services shall not be included in the bid.&nbsp;&nbsp;<\/p>\n<p>\n\t&nbsp;II.&nbsp; Responses to contractor questions from the walkthrough occurring on November 15, 2010.&nbsp;<\/p>\n<p>\n\t&nbsp;a)&nbsp; Pool tables are to remain in the room and be placed on wheels for ease of movement by the contractor.<\/p>\n<p>\n\t&nbsp;b)&nbsp; Bid documents require mastic (adhesive) to be removed.<\/p>\n<p>\n\t&nbsp;c)&nbsp; Park and Recreation Office will be unoccupied for 3 days to allow for floor removal in the large hallway.<\/p>\n<p>\n\t&nbsp;III.&nbsp; This addendum does not affect the original bid date, bid time or bid place.<\/p>\n<p>\n\t&nbsp;<strong>BIDDERS ARE INSTRUCTED TO NOTE THIS ADDENDUM ON THE BID FORM.<\/strong><\/p>\n<p>\n\t&nbsp;<strong>DATED:&nbsp;&nbsp; November 17, 2010<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract document changes and clarifications from the walkthrough conducted on November 15, 2010. <a href=\"https:\/\/sudbury.ma.us\/building\/2010\/11\/17\/addendum-1-floor-tile-replacement-fairbank-center\/\" aria-label=\"Read full article about Addendum 1 &#8211; Floor Tile Replacement Fairbank Center\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/16"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/comments?post=16"}],"version-history":[{"count":0,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/16\/revisions"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/media?parent=16"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/categories?post=16"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/tags?post=16"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}