{"id":17,"date":"2010-11-18T14:10:26","date_gmt":"2010-11-18T14:10:26","guid":{"rendered":"https:\/\/sudbury.ma.us\/building\/2010\/11\/18\/addendum-2-floor-tile-replacement-fairbank-center\/"},"modified":"2010-11-18T14:10:26","modified_gmt":"2010-11-18T14:10:26","slug":"addendum-2-floor-tile-replacement-fairbank-center","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/building\/2010\/11\/18\/addendum-2-floor-tile-replacement-fairbank-center\/","title":{"rendered":"Addendum 2 &#8211; Floor Tile Replacement Fairbank Center"},"content":{"rendered":"<p>\n\t&nbsp;<\/p>\n<p align=\"center\">\n\t<strong>Floor Tile Replacement, Including Removal of Asbestos-Containing Existing Tile <\/strong><\/p>\n<p align=\"center\">\n\t&nbsp;&nbsp;Fairbank Community Center<\/p>\n<div style=\"text-align: center; line-height: 100%\">\n\t40 Fairbank Road, Sudbury, MA 01776<\/div>\n<p align=\"center\">\n\t&nbsp;<\/p>\n<p>\n\t<strong>ADDENDUM NO. 2<\/strong><\/p>\n<p>\n\t&nbsp;I.&nbsp; The contract documents are changed as follows:<\/p>\n<p>\n\t&nbsp;Delete the following item (2.2.B-2) from:<\/p>\n<p>\n\t&nbsp;SECTION 096519 &ndash; RESILIENT TILE FLOORING<\/p>\n<p>\n\tPART 2 PRODUCTS<\/p>\n<p>\n\t&nbsp;2.2 INSTALLATION MATERIAL &nbsp;<\/p>\n<p>\n\t&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; B.&nbsp; Adhesives:<\/p>\n<p style=\"margin-left: 1.5in\">\n\t<em>&ldquo;2.&nbsp; Provide Static Dissipative Tile Adhesive with 2 in. (5.08 cm) wide x 24 in. (60.96 cm) long copper ground-connection strips under the tile.&rdquo;<\/em><\/p>\n<p>\n\t&nbsp;<\/p>\n<p>\n\t&nbsp;<\/p>\n<p>\n\tII.&nbsp;&nbsp; Additional clarifications to contractor questions from the November 15, 2010 walkthrough:<\/p>\n<p>\n\t&nbsp;<\/p>\n<ol>\n<li>\n\t\tMastic is non-asbestos containing and is required to be removed without the use of solvents.<\/li>\n<li>\n\t\tBuilding shall be considered a school and subject to AHERA.<\/li>\n<\/ol>\n<p>\n\t&nbsp;<\/p>\n<p>\n\t&nbsp;<\/p>\n<p>\n\tIII.&nbsp; This addendum does not affect the original bid date, bid time or bid place.<\/p>\n<p>\n\t&nbsp;<\/p>\n<p align=\"center\">\n\t<strong>BIDDERS ARE INSTRUCTED TO NOTE THIS ADDENDUM ON THE BID FORM.<\/strong><\/p>\n<p>\n\t&nbsp;<\/p>\n<p>\n\t<strong>DATED:&nbsp;&nbsp; November 18, 2010<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract document change and additional clarifications to contractors from November 15, 2010 walkthrough. <a href=\"https:\/\/sudbury.ma.us\/building\/2010\/11\/18\/addendum-2-floor-tile-replacement-fairbank-center\/\" aria-label=\"Read full article about Addendum 2 &#8211; Floor Tile Replacement Fairbank Center\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/17"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/comments?post=17"}],"version-history":[{"count":0,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/17\/revisions"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/media?parent=17"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/categories?post=17"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/tags?post=17"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}