{"id":20,"date":"2011-05-04T10:52:59","date_gmt":"2011-05-04T10:52:59","guid":{"rendered":"https:\/\/sudbury.ma.us\/building\/2011\/05\/04\/addendum-1-vault-hvac-system\/"},"modified":"2011-05-04T10:52:59","modified_gmt":"2011-05-04T10:52:59","slug":"addendum-1-vault-hvac-system","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/building\/2011\/05\/04\/addendum-1-vault-hvac-system\/","title":{"rendered":"Addendum 1 &#8211; Vault HVAC System"},"content":{"rendered":"<p>\n\t&nbsp;<\/p>\n<div>\n<p>\n\t\t&nbsp;<\/p>\n<\/div>\n<p align=\"center\">\n\tMEMORANDUM<\/p>\n<div>\n<p align=\"center\">\n\t\t&nbsp;<\/p>\n<\/div>\n<p>\n\t&nbsp;<\/p>\n<p>\n\t&nbsp;<\/p>\n<table border=\"0\" cellpadding=\"0\" cellspacing=\"0\" style=\"width: 618px\" width=\"773\">\n<tbody>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\tDATE:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\tMay 2, 2011<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\tTO:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\tJim Kelley<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\tFROM:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\tBill Scanlon<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\tSUBJECT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\tTown of Sudbury<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 18px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 18px\">\n<p>\n\t\t\t\t\tVault HVAC System<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 18px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<td style=\"width: 505px; height: 18px\">\n<p>\n\t\t\t\t\t&nbsp;<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 113px; height: 17px\">\n<p>\n\t\t\t\t\tCOPIES TO:<\/p>\n<\/td>\n<td style=\"width: 505px; height: 17px\">\n<p>\n\t\t\t\t\tFile<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div>\n<p align=\"center\">\n\t\t&nbsp;<\/p>\n<\/div>\n<p>\n\t&nbsp;<\/p>\n<p style=\"margin-left: 1.5in\">\n\tAddendum #1<\/p>\n<p style=\"margin-left: 1.5in\">\n\t&nbsp;<\/p>\n<p style=\"margin-left: 1.5in\">\n\tClarifications<\/p>\n<ol>\n<li>\n\t\tThere are no liquidated damages.<\/li>\n<li>\n\t\tThere is no fencing within the project.<\/li>\n<li>\n\t\tCutting and patching is the responsibility of the contractor.&nbsp; The Town of Sudbury will paint patches once the project is complete.<\/li>\n<li>\n\t\tFire Alarm lockout during construction shall be the responsibility of the contractor.<\/li>\n<li>\n\t\tThe new HVAC system is less than 2000 CFM and is not required to report back to the building fire alarm system.&nbsp; The new system shall be provided with a smoke detector and controls.&nbsp; The system shall de-energize the system and close dampers once it senses smoke.<\/li>\n<li>\n\t\tThe thermostat shall be installed within the basement vault.<\/li>\n<li>\n\t\tThe vault wall thickness is unknown, plans dated 4-14-31 indicate 16 inches in lower vault and 13 inches in upper vault<\/li>\n<\/ol>\n<p>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Clarification to the bid documents for the Town Hall Vault HVAC system.  Bid opening remains the same, Friday, May 6, 2011 at 1:00 p.m. <a href=\"https:\/\/sudbury.ma.us\/building\/2011\/05\/04\/addendum-1-vault-hvac-system\/\" aria-label=\"Read full article about Addendum 1 &#8211; Vault HVAC System\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/20"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/comments?post=20"}],"version-history":[{"count":0,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/posts\/20\/revisions"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/media?parent=20"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/categories?post=20"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/building\/wp-json\/wp\/v2\/tags?post=20"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}