{"id":3,"date":"2005-08-15T07:57:14","date_gmt":"2005-08-15T07:57:14","guid":{"rendered":"https:\/\/sudbury.ma.us\/designreviewboard\/2005\/08\/15\/sign-permit-applications\/"},"modified":"2025-01-22T13:57:46","modified_gmt":"2025-01-22T18:57:46","slug":"sign-permit-applications","status":"publish","type":"post","link":"https:\/\/sudbury.ma.us\/designreviewboard\/2005\/08\/15\/sign-permit-applications\/","title":{"rendered":"Design Review Board Application &amp; Procedures"},"content":{"rendered":"<p>The Design Review Board typically meets on the second and fourth Wednesdays of the month based on the applications received. Applications must be received by <strong><u>12:30PM<\/u><\/strong> on the Wednesday before the scheduled meeting.<\/p>\n<p>Before you have your business sign made or installed you are required to get approval from the Design Review Board, and will need to submit the following information:<\/p>\n<ul>\n<li>Three (3) hard copy sign application packets with supporting documents.<\/li>\n<li>A single PDF via email of all application materials.<\/li>\n<\/ul>\n<p>Please be sure to include the building frontage, as this is necessary under the sign bylaw to determine the allowable size of the sign.<\/p>\n<p>If your application is complete, you will be placed on the next available Design Review Board agenda. You will be notified of the date and time of your review. A representative is required to attend the meeting.&nbsp; If your application is deemed to be incomplete for any reason you will be notified and told what materials\/information is missing. Upon the submission of the outstanding items you will be assigned a meeting date.<\/p>\n<p>You can find the Sign Application by clicking <a href=\"https:\/\/sudbury.ma.us\/designreviewboard\/wp-content\/uploads\/sites\/280\/2005\/08\/DRB-Sign-Application-Review-Procedures-250122.pdf?version=ded350406400e7c316551d4365644f15\"><strong><u>HERE<\/u><\/strong><\/a>. There is no fee associated with the Design Review Board.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before you have your business sign made or installed you are required to get approval from the Design Review Board. <a href=\"https:\/\/sudbury.ma.us\/designreviewboard\/2005\/08\/15\/sign-permit-applications\/\" aria-label=\"Read full article about Design Review Board Application &amp; Procedures\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":1210,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,206,327],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/posts\/3"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/comments?post=3"}],"version-history":[{"count":8,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/posts\/3\/revisions"}],"predecessor-version":[{"id":1781,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/posts\/3\/revisions\/1781"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/media\/1210"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/media?parent=3"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/categories?post=3"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/designreviewboard\/wp-json\/wp\/v2\/tags?post=3"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}