{"id":1046,"date":"2021-08-26T15:30:59","date_gmt":"2021-08-26T19:30:59","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/?p=1046"},"modified":"2021-08-26T15:33:21","modified_gmt":"2021-08-26T19:33:21","slug":"town-wide-roadway-resurfacing-schedule-2-2-2","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2021\/08\/26\/town-wide-roadway-resurfacing-schedule-2-2-2\/","title":{"rendered":"2021 Town-Wide Roadway Resurfacing Schedule"},"content":{"rendered":"<p>The Sudbury Public Works Department is implementing its <a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/2021-Paving-Road-Lists-for-the-web.pdf?version=e66361d01e07076c8a0d357a7e380abb\"><span style=\"text-decoration: underline;\">2021 Pavement Management Program<\/span><\/a>. The program will use industry-leading methods to assure the work is completed as efficiently as possible and that the road surface improvements last for many years.<\/p>\n<p>During the process, we aim to produce the least disruption possible to drivers and residents.<\/p>\n<p><strong>UPDATE 8\/26\/21: Raymond Road Micro Surfacing Work Scheduled To Begin <\/strong><strong>Sunday 8\/29<\/strong><\/p>\n<p>Raymond Road is scheduled for Micro Surfacing work on Sunday, August 29 and Monday, August 30. Drivers are asked to follow detour signs while exiting roadway and to plan accordingly.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>UPDATE 8\/13\/21: Morse Road Paving Scheduled To Begin Monday 8\/16<\/strong><\/p>\n<p>Morse Road (Concord Road to Marlboro Road) is scheduled for paving on Monday, August 16 and Tuesday, August 17. Drivers are asked to follow detour signs while exiting roadway and to plan accordingly.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>UPDATE 7\/21\/21: Morse Road &amp; Raymond Road Work Scheduling Updated<\/strong><\/p>\n<p>Morse Road Mill Overlay work scheduled to begin July 29. Raymond Road Micro Surfacing work scheduled to begin August 29. For details, please see <a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/2021-Paving-Road-Lists-for-the-web.pdf?version=223ffbbe04645a6827491a251d2f7a88\">2021 Roadwork Schedule<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong>UPDATE 5\/17\/21: ROADWORK START DATE DELAYED<\/strong><\/span><\/p>\n<p>Road Work has been delayed by two days, now scheduled to begin on Wednesday, May 19.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>IMPORTANT FOR DRIVERS &amp; RESIDENTS<\/strong>:<\/p>\n<ul style=\"list-style-type: circle;\">\n<li><span class=\"marginB5\"><strong><span style=\"text-decoration: underline;\">Timeframe<\/span>:<\/strong> Beginning May 19, 2021 and continuing throughout the spring and summer.<\/span><\/li>\n<li><span class=\"marginB5\"><strong><u>Morning Work:<\/u><\/strong> Roadwork starts at 7:00AM and may continue into the evening hours as needed.<\/span><\/li>\n<li><span class=\"marginB5\"><strong><u>Night Work:<\/u><\/strong> Working at night makes it possible to keep roads open during the day to allow normal traffic flow. However, night work, which is performed between 8:00PM &#8211; 3:00AM, may be disruptive at times.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline;\"><strong>Driveway Access:<\/strong><\/span> There may be times when access to private residential driveways is restricted and you may not be able to pull into your driveway until road work has passed.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline;\"><strong>Work Crews:<\/strong><\/span> It is crucial that vehicles and pedestrians please follow all signs and observe traffic control crew instructions to avoid damages to the road work as well as your vehicle.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline;\"><strong>Emergency Notifications:<\/strong><\/span> To receive notifications regarding road work and closures, please sign up at: <a href=\"https:\/\/sudbury.bbcportal.com\/\">https:\/\/sudbury.ma.us\/R911<\/a><span style=\"font-size: 1rem;\">&nbsp;(Will be issued night prior to paving roadway)<\/span><\/span><\/li>\n<\/ul>\n<p><strong>Schedules are <u>subject to change<\/u> due to unforeseen conditions<\/strong> that are out of the control of the Public Works Department including weather, equipment-related issues and other contractor commitments. Additional work may be added or work limits may be altered as budgets and construction season allows. Thank you for your patience during this process.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>CLICK <a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/2021-Paving-Road-Lists-for-the-web.pdf?version=e66361d01e07076c8a0d357a7e380abb\">HERE<\/a> FOR 2021 ROAD WORK SCHEDULE:<\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/2021-Paving-Road-Lists-for-the-web.pdf?version=e66361d01e07076c8a0d357a7e380abb\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-1052\" src=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button.png?version=80fe60e0e6d2b245110eeb50149c4f88\" alt=\"\" width=\"1880\" height=\"1576\" srcset=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button.png 1880w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button-300x251.png 300w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button-1024x858.png 1024w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button-768x644.png 768w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button-1536x1288.png 1536w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2021\/05\/road-work-schedule-button-358x300.png 358w\" sizes=\"(max-width: 1880px) 100vw, 1880px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UPDATE 8\/26\/21: Raymond Road Micro Surfacing Work Scheduled To Begin Sunday 8\/29. <a href=\"https:\/\/sudbury.ma.us\/dpw\/2021\/08\/26\/town-wide-roadway-resurfacing-schedule-2-2-2\/\" aria-label=\"Read full article about 2021 Town-Wide Roadway Resurfacing Schedule\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":81,"featured_media":1050,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/1046"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=1046"}],"version-history":[{"count":16,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/1046\/revisions"}],"predecessor-version":[{"id":1231,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/1046\/revisions\/1231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media\/1050"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=1046"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=1046"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=1046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}