{"id":2076,"date":"2024-07-22T10:17:47","date_gmt":"2024-07-22T14:17:47","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/?p=2076"},"modified":"2024-10-17T12:16:06","modified_gmt":"2024-10-17T16:16:06","slug":"town-wide-roadway-resurfacing-schedule-2024","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2024\/07\/22\/town-wide-roadway-resurfacing-schedule-2024\/","title":{"rendered":"2024 Town-Wide Paving and Resurfacing Program"},"content":{"rendered":"<p>The Sudbury Public Works Department is implementing its 2024 Pavement Management Program. The program will use industry-leading methods to assure the work is completed as efficiently as possible and that the road surface improvements last for many years. During the process, we aim to produce the least disruption possible to drivers and residents.<\/p>\n<p>&nbsp;<\/p>\n<h4><strong><span style=\"color: #ff0000\">UPDATE<\/span> SUDBURY 2024 PAVING 2-day lookahead<\/strong> 7\/24\/24<\/h4>\n<p>&nbsp;<\/p>\n<p><strong><u>THURSDAY, JULY 25 <\/u><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>LINCOLN ROAD, 7AM TO 5PM.&nbsp; From Lincoln Meadows to Lincoln Lane.<\/p>\n<p>WEIR HILL ROAD, 10AM TO 3PM.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>FRIDAY, JULY 26<\/u><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>LINCOLN ROAD, 7AM TO 1PM.&nbsp;<\/p>\n<p>ROBBINS ROAD, 1PM TO 5PM.<\/p>\n<p>WILSHIRE ROAD, 1PM TO 5PM<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>TRAFFIC CONTROL ON LINCOLN ROAD<\/u><\/strong><\/p>\n<p><u>&nbsp;<\/u><\/p>\n<p><u>We will coordinate with Wayland officials to place a BRIDGE CLOSED sign and ROAD CLOSED TO THRU TRAFFIC sign at Sherman\u2019s Bridge Road and Oxbow Road.<\/u>&nbsp; &nbsp;&nbsp;&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Notes:&nbsp;<\/p>\n<ol>\n<li>The above is subject to change.<\/li>\n<li>Cavicchio\u2019s Greenhouses will be made accessible as much as possible.&nbsp;<\/li>\n<li>Cones will be utilized between east and westbound lanes to prevent crossover into soft pavement.&nbsp;&nbsp;<\/li>\n<\/ol>\n<p>We thank you for your patience.&nbsp;&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h4><a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/07\/2024-Paving-Schedule.pdf?version=e083d7121afe6fd2d179d382fbfc95e7\">2024 Paving Schedule<\/a> 7\/19\/24<\/h4>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/dpw\/?p=2136\"><strong>Lincoln Road Milling Update<\/strong><\/a> 7\/18\/24<\/p>\n<p><strong><a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/07\/Public-Notification-Cedar-Creek-and-Willard-Grant.pdf?version=d2b32063337a7c10203208777d91ef50\">Cedar Creek and Willard Grant Road Paving Update<\/a> <\/strong>7\/18\/24<\/p>\n<p>&nbsp;<\/p>\n<table>\n<caption style=\"caption-side: top\">\n<h5><strong>PAVING <\/strong>(5-Year Moratorium*)<strong><br \/>\n<\/strong><strong>Expected Start Date:&nbsp; JULY 15, 2024<\/strong><\/h5>\n<\/caption>\n<thead>\n<tr>\n<th>Road<\/th>\n<th>From<\/th>\n<th>To<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Lincoln Rd<\/td>\n<td>Concord Rd<\/td>\n<td>Wayland TL<\/td>\n<\/tr>\n<tr>\n<td>Cedar Creek Rd<\/td>\n<td>Willard Grant Rd<\/td>\n<td>Powers Rd<\/td>\n<\/tr>\n<tr>\n<td>Darvell Drive<\/td>\n<td>Witherell Drive<\/td>\n<td>Belcher Drive<\/td>\n<\/tr>\n<tr>\n<td>Greystone Ln<\/td>\n<td>End<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Julians Way<\/td>\n<td>Haynes Rd<\/td>\n<td>Greystone Ln<\/td>\n<\/tr>\n<tr>\n<td>Mary Catherine Ln<\/td>\n<td>North Rd<\/td>\n<td>North Rd<\/td>\n<\/tr>\n<tr>\n<td>Newbridge Rd<\/td>\n<td>Concord Rd<\/td>\n<td>Water Row<\/td>\n<\/tr>\n<tr>\n<td>Pipsissewa Cir<\/td>\n<td>White Oak Ln<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Puffer Ln<\/td>\n<td>Haynes Rd<\/td>\n<td>North Rd<\/td>\n<\/tr>\n<tr>\n<td>Robbins Rd<\/td>\n<td>Bent Rd<\/td>\n<td>Howell Rd<\/td>\n<\/tr>\n<tr>\n<td>Weir Hill Rd<\/td>\n<td>Lincoln Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Willard Grant Rd<\/td>\n<td>North Rd<\/td>\n<td>Powers Rd<\/td>\n<\/tr>\n<tr>\n<td>Wilshire Rd<\/td>\n<td>End<\/td>\n<td>End<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span class=\"marginB5\">&nbsp;<\/span><\/p>\n<p><span class=\"marginB5\">&nbsp;<\/span><\/p>\n<table>\n<caption style=\"caption-side: top\">\n<h5><strong>MICRO-SURFACING (3-Year Moratorium*)<\/strong><br \/>\n<strong>Expected Start Date:&nbsp; AUGUST 1, 2024<\/strong><\/h5>\n<\/caption>\n<thead>\n<tr>\n<th>Road<\/th>\n<th>From<\/th>\n<th>To<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Allen Place<\/td>\n<td>Massasoit Ave<\/td>\n<td>Indian Ridge Rd<\/td>\n<\/tr>\n<tr>\n<td>Atkinson Ln<\/td>\n<td>Dutton Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Babe Ruth Dr<\/td>\n<td>Hudson Rd<\/td>\n<td>Atkinson Ln<\/td>\n<\/tr>\n<tr>\n<td>Bishop Ln<\/td>\n<td>Thompson Dr<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Bradley Place<\/td>\n<td>Massasoit Ave<\/td>\n<td>Indian Ridge Rd<\/td>\n<\/tr>\n<tr>\n<td>Carriage Way<\/td>\n<td>French Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Clark Ln<\/td>\n<td>Old Lancaster Rd<\/td>\n<td>Indian Ridge Rd<\/td>\n<\/tr>\n<tr>\n<td>Franklin Place<\/td>\n<td>Massasoit Ave<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Henry\u2019s Mill Ln<\/td>\n<td>French Rd<\/td>\n<td>Carriage Way<\/td>\n<\/tr>\n<tr>\n<td>Indian Ridge Rd<\/td>\n<td>Old Lancaster Rd<\/td>\n<td>Pokonoket Ave<\/td>\n<\/tr>\n<tr>\n<td>Mark Ln<\/td>\n<td>Maynard Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Massasoit Ave<\/td>\n<td>Boston Post Rd<\/td>\n<td>Franklin Place<\/td>\n<\/tr>\n<tr>\n<td>Perry Circle<\/td>\n<td>Atkinson Ln<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Peterson Circle<\/td>\n<td>Atkinson Ln<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Thompson Dr<\/td>\n<td>Concord Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<tr>\n<td>Ward Rd<\/td>\n<td>Maynard Rd<\/td>\n<td>End<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong>*MORATORIUMS<\/strong><\/p>\n<p>Newly paved and resurfaced roadways in Sudbury will have a moratorium placed on them such that we will not allow any utility cuts into them unless an emergency situation arises. The duration of the moratorium is listed below with the type of rehabilitation:<\/p>\n<ol>\n<li>Paving: 5-Year Moratorium<\/li>\n<li>Micro Surfacing: 3-Year Moratorium&nbsp;<\/li>\n<\/ol>\n<p><a href=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan.pdf?version=cf866894a9709b3e2abdb84df58501e9\"><img decoding=\"async\" loading=\"lazy\" class=\"size-large wp-image-2077 aligncenter\" src=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-862x1024.jpg\" alt=\"This map shows the roads affected by the paving and resurfacing. For a list of roads, see the Paving and Micro-Surfacing tables earlier in this article.\" width=\"584\" height=\"694\" srcset=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-862x1024.jpg 862w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-252x300.jpg 252w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-768x913.jpg 768w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-1293x1536.jpg 1293w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2024\/06\/2024-Paving-and-Resurfacing-Plan-1724x2048.jpg 1724w\" sizes=\"(max-width: 584px) 100vw, 584px\" \/><\/a><\/p>\n<h4>Description of Resurfacing Techniques<\/h4>\n<p><strong>PAVING<\/strong><\/p>\n<p>Paving a roadway will either involve overlaying the existing pavement or milling the existing pavement and paving.&nbsp;<\/p>\n<ol>\n<li>Cold Planing \u2013 the existing pavement has 1.5 to 2 inches of its surface milled off.<\/li>\n<li>Overlaying \u2013 driveways and side streets are cold planed for smooth transition to the increase in roadway elevation.<\/li>\n<li>Paving \u2013 a new 1.5 to 2 inch layer of asphalt is applied.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p><strong>MICRO SURFACING<\/strong><\/p>\n<p>A Micro Surface is a thin layer (3\/8-inch) preventative maintenance treatment applied to an existing paved (and crack sealed) surface. Consists of a carefully proportioned blend of polymer-modified asphalt emulsion, crushed aggregate, water and mineral filler. The preservation treatment extends the life of the asphalt by providing skid resistance, restricting moisture intrusion, UV damage and surface raveling, and overall appearance.&nbsp; &nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h4>Important for Drivers and Residents<\/h4>\n<ul style=\"list-style-type: circle\">\n<li><span class=\"marginB5\"><strong><span style=\"text-decoration: underline\">Timeframe<\/span>:<\/strong> Beginning mid-July and continuing throughout the summer.<\/span><\/li>\n<li><span class=\"marginB5\"><strong><u>Morning Work:<\/u><\/strong> Roadwork starts at 7:00AM and may continue into the evening hours as needed.<\/span><\/li>\n<li><span class=\"marginB5\"><strong><u>Night Work:<\/u><\/strong> Working at night makes it possible to keep roads open during the day to allow normal traffic flow. However, night work, which is performed between 8:00PM &#8211; 3:00AM, may be disruptive at times.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline\"><strong>Driveway Access:<\/strong><\/span> There may be times when access to private residential driveways is restricted and you may not be able to pull into your driveway until road work has passed.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline\"><strong>Work Crews:<\/strong><\/span> It is crucial that vehicles and pedestrians please follow all signs and observe traffic control crew instructions to avoid damages to the road work as well as your vehicle.<\/span><\/li>\n<li><span class=\"marginB5\"><span style=\"text-decoration: underline\"><strong>Emergency Notifications:<\/strong><\/span> To receive notifications regarding road work and closures, please sign up at: <a href=\"https:\/\/sudbury.bbcportal.com\/\">https:\/\/sudbury.ma.us\/R911<\/a><span style=\"font-size: 1rem\">&nbsp;(Will be issued night prior to paving roadway)<\/span><\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #ff0000\"><strong>Schedules are <u>subject to change<\/u> due to unforeseen conditions<\/strong><\/span> that are out of the control of the Public Works Department including weather, equipment-related issues and other contractor commitments. Additional work may be added or work limits may be altered as budgets and construction season allows. Thank you for your patience during this process.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UPDATE:  SUDBURY 2024 PAVING 2-day lookahead <a href=\"https:\/\/sudbury.ma.us\/dpw\/2024\/07\/22\/town-wide-roadway-resurfacing-schedule-2024\/\" aria-label=\"Read full article about 2024 Town-Wide Paving and Resurfacing Program\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":81,"featured_media":1050,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2076"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=2076"}],"version-history":[{"count":29,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2076\/revisions"}],"predecessor-version":[{"id":2165,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2076\/revisions\/2165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media\/1050"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=2076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=2076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=2076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}