{"id":2353,"date":"2025-07-03T09:25:58","date_gmt":"2025-07-03T13:25:58","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/?p=2353"},"modified":"2025-07-03T09:26:13","modified_gmt":"2025-07-03T13:26:13","slug":"2025-paving-scehdule","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2025\/07\/03\/2025-paving-scehdule\/","title":{"rendered":"2025 Paving Schedule"},"content":{"rendered":"<p>Please be advised that starting Wednesday July 9th, Sunshine Paving will start work for the Town&#8217;s Annual Paving Project on the following roadways:&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<table width=\"592\">\n<tbody>\n<tr>\n<td width=\"257\"><strong>ROAD<\/strong><\/td>\n<td width=\"128\"><strong>FROM<\/strong><\/td>\n<td width=\"207\"><strong>TO<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Dutton Road<\/td>\n<td width=\"128\">Wayside Inn Rd<\/td>\n<td width=\"207\">Bridge at Stearns Mill Pond<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Candy Hill Road<\/td>\n<td width=\"128\">Concord Rd<\/td>\n<td width=\"207\">Plympton Rd<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Virginia Ridge Road<\/td>\n<td width=\"128\">Powder Mill Rd<\/td>\n<td width=\"207\">End<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Austin Drive<\/td>\n<td width=\"128\">Hilltop Rd<\/td>\n<td width=\"207\">End<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Trevor Way<\/td>\n<td width=\"128\">Horse Pond Rd<\/td>\n<td width=\"207\">End<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Tippling Rock Road<\/td>\n<td width=\"128\">Dudley Rd<\/td>\n<td width=\"207\">End<\/td>\n<\/tr>\n<tr>\n<td width=\"257\">Church Street<\/td>\n<td width=\"128\">Concord Rd<\/td>\n<td width=\"207\">End<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>\u2018* Note: These dates subject to change. Note to residents living on these streets: Expect delays if hot asphalt is placed across your driveway. The pavement needs to cool down prior to being driven on. Unsightly tire tracks may result if driven on prematurely. Cool down period is approximately 30-45 minutes. We apologize for any inconvenience. Thank You.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Please be advised that starting Wednesday July 9th, Sunshine Paving will start work for the Town&#8217;s Annual Paving Project on the following roadways:&nbsp; &nbsp; ROAD FROM TO Dutton Road Wayside Inn Rd Bridge at Stearns &hellip; <a href=\"https:\/\/sudbury.ma.us\/dpw\/2025\/07\/03\/2025-paving-scehdule\/\" aria-label=\"Read full article about 2025 Paving Schedule\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":124,"featured_media":1696,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2353"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/124"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=2353"}],"version-history":[{"count":2,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2353\/revisions"}],"predecessor-version":[{"id":2355,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2353\/revisions\/2355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media\/1696"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=2353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=2353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=2353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}