{"id":2554,"date":"2026-04-01T12:21:39","date_gmt":"2026-04-01T16:21:39","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/?p=2554"},"modified":"2026-04-01T12:21:39","modified_gmt":"2026-04-01T16:21:39","slug":"bid-for-old-sudbury-road-culvert-replacement-project","status":"publish","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2026\/04\/01\/bid-for-old-sudbury-road-culvert-replacement-project\/","title":{"rendered":"Bid for Old Sudbury Road Culvert Replacement Project"},"content":{"rendered":"<p>Town of Sudbury, MA (Owner) invites Bidders to submit ELECTRONIC sealed Bids for the Old Sudbury Road Culverts 110 and 149 Replacement Project Contract No. 2026-OSRC-1 which includes the replacement of box and pipe culverts including full depth pavement reconstruction on Old Sudbury Road. Work shall commence by June 12th, 2026. Substantial Completion: within 116 days. Final Completion: within 130 days. Bidding is per MGL Chapter 30 s39M. Prevailing wage rates per MGL c149 s26 to 27D inclusive issued by Dept. of Labor Standards.<\/p>\n<p>Request electronic Bidding Documents (no cost) on or after April 2nd, 2026 at 11:00 AM electronically at www.biddocsonline.com or at Nashoba Blue, Inc., at 433 Main Street, Hudson, MA 01749.<\/p>\n<p>Bidders must be MassDOT prequalified in the class of work of \u201cBridges &#8211; Culverts\u201d or \u201cHighway Construction\u201d for the Project with an estimated value of $640,004.00 in order to be eligible to Bid.<\/p>\n<p>Mandatory pre-bid conference: 11:00 AM local time on April 9th, 2026.<\/p>\n<p>Electronic Bids will be received until 11:00 a.m. local time on April 23rd, 2026 through BidDocs ONLINE only (www.biddocsonline.com) with Bid security of 5% of total Bid. Hard copy bids will not be accepted. Bids willthen be publicly opened online.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Town of Sudbury, MA (Owner) invites Bidders to submit ELECTRONIC sealed Bids for the Old Sudbury Road Culverts 110 and 149 Replacement Project Contract No. 2026-OSRC-1 which includes the replacement of box and pipe culverts &hellip; <a href=\"https:\/\/sudbury.ma.us\/dpw\/2026\/04\/01\/bid-for-old-sudbury-road-culvert-replacement-project\/\" aria-label=\"Read full article about Bid for Old Sudbury Road Culvert Replacement Project\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":124,"featured_media":1004,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,165],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2554"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/124"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=2554"}],"version-history":[{"count":1,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2554\/revisions"}],"predecessor-version":[{"id":2555,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2554\/revisions\/2555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media\/1004"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=2554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=2554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=2554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}