{"id":2593,"date":"2026-07-24T08:33:06","date_gmt":"2026-07-24T12:33:06","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/?p=2593"},"modified":"2026-07-27T10:11:38","modified_gmt":"2026-07-27T14:11:38","slug":"2026-paving-scehdule","status":"publish","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2026\/07\/24\/2026-paving-scehdule\/","title":{"rendered":"2026 Paving Schedule"},"content":{"rendered":"<p><strong><span style=\"color: #c00000\">UPDATE 7\/27\/26<\/span>:<\/strong> Closure at&nbsp;Concord Road between Old Lancaster Road and Hudson Road <strong>POSTPONED to a date TBD.<\/strong> Please stay tuned for details.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-2609 size-full\" src=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/road-work-postponed_edited.jpg?version=45c1b8d324dbf11bd6c28a764ea2f0e6\" alt=\"\" width=\"725\" height=\"800\" srcset=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/road-work-postponed_edited.jpg 725w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/road-work-postponed_edited-272x300.jpg 272w\" sizes=\"(max-width: 725px) 100vw, 725px\" \/><\/p>\n<p><strong><span style=\"color: #c00000\">UPDATE 7\/15\/26<\/span><\/strong>: This Friday, 7\/17\/26, from 7AM to 3PM, northbound traffic on part of Concord Road (from Old Lancaster Rd to Hudson Rd) will be detoured during roadway milling. Southbound traffic is expected to proceed as usual. Please see map below for details.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-2600\" src=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26-1024x888.jpg\" alt=\"\" width=\"584\" height=\"506\" srcset=\"https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26-1024x888.jpg 1024w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26-300x260.jpg 300w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26-768x666.jpg 768w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26-346x300.jpg 346w, https:\/\/sudbury.ma.us\/dpw\/wp-content\/uploads\/sites\/283\/2026\/07\/concord-road-detour-7.17.26.jpg 1135w\" sizes=\"(max-width: 584px) 100vw, 584px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Please be advised that starting Monday July 13, Sunshine Paving will start work for the Town&#8217;s Annual Paving Project on the following roadways:&nbsp;<\/p>\n<ul>\n<li>Austin Road<\/li>\n<li>Concord Road (from 197 Concord Road to Hudson Road)<\/li>\n<li>Ford Road<\/li>\n<li>Hammond Circle<\/li>\n<li>Harvard Drive<\/li>\n<li>Hayden Circle<\/li>\n<li>Hobart Road<\/li>\n<li>Lafayette Drive<\/li>\n<li>Revere Street<\/li>\n<li>Revolutionary Road<\/li>\n<li>Ruddock Road<\/li>\n<li>Washington Drive<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Roadway milling is anticipated to begin on the week of July 13 with paving taking place on the week of July 20.<\/p>\n<p>PLEASE NOTE: <strong>Roadwork<\/strong> <strong>dates are subject to change<\/strong>.<\/p>\n<p>Residents living on and using these streets are asked to prepare for delays. Freshly laid pavement needs to cool down for approximately 30-45 minutes before vehicles can safely pass.<\/p>\n<p>Residents are encouraged to sign up for <a href=\"https:\/\/www.smart911.com\/smart911\/ref\/reg.action?pa=SudburyMa\">Reverse 911\/Emergency Notifications<\/a> at <a href=\"https:\/\/www.smart911.com\/smart911\/ref\/reg.action?pa=SudburyMa\">https:\/\/www.smart911.com\/smart911\/ref\/reg.action?pa=SudburyMa<\/a><\/p>\n<p>We apologize for any delays and inconvenience this may cause and thank you for your patience as we work to improve Sudbury&#8217;s roads!<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UPDATE: Closure at\u00a0Concord Road between Old Lancaster Road and Hudson Road POSTPONED to a date TBD. Please stay tuned for details.<br \/>\nOn Monday July 13, Sunshine Paving will start work for the Town&#8217;s Annual Paving Project. <a href=\"https:\/\/sudbury.ma.us\/dpw\/2026\/07\/24\/2026-paving-scehdule\/\" aria-label=\"Read full article about 2026 Paving Schedule\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":81,"featured_media":2603,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2593"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=2593"}],"version-history":[{"count":12,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2593\/revisions"}],"predecessor-version":[{"id":2610,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/2593\/revisions\/2610"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media\/2603"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=2593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=2593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=2593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}