{"id":33,"date":"2010-07-22T08:48:30","date_gmt":"2010-07-22T08:48:30","guid":{"rendered":"https:\/\/sudbury.ma.us\/dpw\/2010\/07\/22\/fiscal-year-2011-summer-paving-program\/"},"modified":"2010-07-22T08:48:30","modified_gmt":"2010-07-22T08:48:30","slug":"fiscal-year-2011-summer-paving-program","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/dpw\/2010\/07\/22\/fiscal-year-2011-summer-paving-program\/","title":{"rendered":"Fiscal Year 2011 Summer Paving Program"},"content":{"rendered":"<p align=\"left\">\n\t&nbsp;<font size=\"3\">You will notice on some streets that water structures and manholes are being raised this week in preparation for paving under the Chapter 90 program (see below). This is in anticipation of starting on Monday, July 19. The list of streets is as follows: <\/font><\/p>\n<p>\n\t<font size=\"3\">Gerry Drive <\/font><\/p>\n<p>\n\t<font size=\"3\">Washbrook Road <\/font><\/p>\n<p>\n\t<font size=\"3\">Pine Ridge Road <\/font><\/p>\n<p>\n\t<font size=\"3\">Village Road&nbsp; (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Thompson Drive (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Bishop Lane (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Jack Pine Drive <\/font><\/p>\n<p>\n\t<font size=\"3\">Red Oak Drive <\/font><\/p>\n<p>\n\t<font size=\"3\">Pantry Road&nbsp; (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Dakin Road&nbsp; (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Emerson Way&nbsp; (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Victoria Road <\/font><\/p>\n<p>\n\t<font size=\"3\">Griscom Road <\/font><\/p>\n<p>\n\t<font size=\"3\">Walker Farm Road&nbsp; (complete)<\/font><\/p>\n<p>\n\t<font size=\"3\">Allen Place <\/font><\/p>\n<p>\n\t<font size=\"3\">Bradley Place <\/font><\/p>\n<p>\n\t<font size=\"3\">Singletary Lane <\/font><\/p>\n<p>\n\t<font size=\"3\">Massasoit Avenue <\/font><\/p>\n<p>\n\t<font size=\"3\">Franklin Place <\/font><\/p>\n<p>\n\t<font size=\"3\">This notice will be updated accordingly as paving progresses. <\/font><\/p>\n<p>\n\t<font size=\"3\"><strong>State Chapter 90 Funds Road Paving Project<\/strong><\/font><\/p>\n<p>\n\t<font size=\"3\">Q. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; What is the Chapter 90 Program?<\/font><\/p>\n<p>\n\t<font size=\"3\">A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Chapter 90 Program was enacted on March 23, 1973, by vote of the Public Works Commission to entitle municipalities to reimbursement of documented expenditures under the provisions of General Laws, Chapter 90, Section 34, Clause 2(a) on approved Projects. The Funds provided from Transportation Bond Issues authorizes Capital Improvement Projects for Highway Construction, Preservation and Improvement Projects that create or extend the life of Capital Facilities.&nbsp; Funds must be allocated to roadway projects, such as resurfacing and related work (the minimum for resurfacing shall be 3\/4&quot; course with a continuous length of 500&#39;) and other work incidental to the above such as preliminary engineering including State Aid\/Consultant Design Agreements, right-of-way acquisition, shoulders, side road approaches, landscaping and tree planting, roadside drainage, structures (including bridges), sidewalks, traffic control and service facilities, street lighting (excluding operating costs), and for such other purposes as the Department may specifically authorize.<\/font><\/p>\n<p>\n\t<font size=\"3\">Q.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Can these funds be used for other purposes besides road work?<\/font><\/p>\n<p>\n\t<font size=\"3\">A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; No, these grant funds from the state are limited to projects approved by Massachusetts Highway division of the Department of Transportation.&nbsp;&nbsp;<\/font><\/p>\n<p>\n\t<font size=\"3\">Q.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; How does the state determine how much money each town\/city will receive?<\/font><\/p>\n<p>\n\t<font size=\"3\">A.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The state uses a formula that factors in a community&rsquo;s road miles for accepted roads (58.33%); population (20.83%) and employment (20.83%) using data from other state departments.<\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Getting Ready <a href=\"https:\/\/sudbury.ma.us\/dpw\/2010\/07\/22\/fiscal-year-2011-summer-paving-program\/\" aria-label=\"Read full article about Fiscal Year 2011 Summer Paving Program\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/33"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/comments?post=33"}],"version-history":[{"count":0,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/posts\/33\/revisions"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/media?parent=33"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/categories?post=33"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/dpw\/wp-json\/wp\/v2\/tags?post=33"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}