{"id":101,"date":"2015-05-18T18:48:00","date_gmt":"2015-05-18T22:48:05","guid":{"rendered":"https:\/\/sudbury.ma.us\/facilities\/wp-content\/uploads\/sites\/290\/2015\/05\/Fairbank-Community-Center-Feasibility-Study-2015March.pdf"},"modified":"2017-05-15T14:42:20","modified_gmt":"2017-05-15T18:42:20","slug":"fairbank-community-center-feasibility-study-2015march","status":"inherit","type":"attachment","link":"https:\/\/sudbury.ma.us\/fairbankstudy\/fairbank-community-center-feasibility-study-2015march\/","title":{"rendered":"Fairbank Community Center 2015 Feasibility Study with Appendix"},"author":8,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false},"description":{"rendered":"<p class=\"attachment\"><a href='https:\/\/sudbury.ma.us\/fairbankstudy\/wp-content\/uploads\/sites\/290\/2015\/05\/Fairbank-Community-Center-Feasibility-Study-2015March.pdf?version=aa0bfa9183bff5604b24e200eed8cb4b'>Fairbank Community Center 2015 Feasibility Study with Appendix<\/a><\/p>\n<p>The purpose of this project is to develop a master plan for the Fairbank Community Center which includes the Atkinson Pool, the Senior Center, Park<br \/>\nand Recreation, and currently houses the Sudbury Public Schools administrative offices. The master plan investigates the feasibility of using the existing structures or creating a new multigenerational community center with expanded programs for the Town of Sudbury.<\/p>\n"},"caption":{"rendered":"<p>Fairbank Community Center 2015 Feasibility Study with Appendix The purpose of this project is to develop a master plan for the Fairbank Community Center which includes the Atkinson Pool, the Senior Center, Park and Recreation, &hellip; <a href=\"https:\/\/sudbury.ma.us\/fairbankstudy\/fairbank-community-center-feasibility-study-2015march\/\" aria-label=\"Read full article about Fairbank Community Center 2015 Feasibility Study with Appendix\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n"},"alt_text":"","media_type":"file","mime_type":"application\/pdf","media_details":{},"post":null,"source_url":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-content\/uploads\/sites\/290\/2015\/05\/Fairbank-Community-Center-Feasibility-Study-2015March.pdf?version=aa0bfa9183bff5604b24e200eed8cb4b","_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-json\/wp\/v2\/media\/101"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-json\/wp\/v2\/media"}],"about":[{"href":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-json\/wp\/v2\/types\/attachment"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/fairbankstudy\/wp-json\/wp\/v2\/comments?post=101"}]}}