Station 2 Progress (Sticky Post) Published December 22, 2022 | Fire Department Site PreparationMore Site WorkFoundation PrepFoundation Footings in PlaceForms for Foundation Walls Concrete Foundation Walls Poured (1)Removing the FormsRemoving the Forms (2)Heating Tube InstallationHeating Tube Installation (2)Installation of Underground PlumbingInstallation of underground utilitiesPreparation for concrete slab pouring (1)Preparation for concrete slab pouring (2)Pouring the Slab (1)Pouring the Slab (2)Framing has begun!Framing progressFraming the roofOffice and Watch Room (1)Office and Watch Room (2)Individual Bunk RoomsPreparing for the roof Preparing for the roof (2)Preparing for the roof (3)The roof is on!View from Route 20 with the roof on.Breaking through to the existing Station Categories Department Page News, Fire Station Rte 20 Construction, Project, Sticky (Stick to Top of List) Email this Post Print this Post Content Shortlink Back to Fire Department