{"id":13,"date":"2013-09-16T10:39:22","date_gmt":"2013-09-16T10:39:22","guid":{"rendered":"https:\/\/sudbury.ma.us\/highway\/2013\/09\/16\/update-on-landham-road\/"},"modified":"2017-10-12T14:24:33","modified_gmt":"2017-10-12T18:24:33","slug":"update-on-landham-road","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/highway\/2013\/09\/16\/update-on-landham-road\/","title":{"rendered":"Update on Landham Road"},"content":{"rendered":"<p>Landham Road was opened to through traffic on Friday, September 13, 2013.&nbsp; Headwalls are being installed on the west side of the culverts and headwalls will be installed on the east side this week.<\/p>\n<p>&nbsp;We hope to have the street paved by the end of the week.&nbsp; The Department of Public Works would like to thank all residents for their patience these past few weeks.<\/p>\n<p>If there are any questions, please call 978-440-5490.<\/p>\n<p>Landham Road Bridge &#8211; Before Construction<br \/>\n<img decoding=\"async\" style=\"height: 225px;width: 300px\" src=\"\/images\/image.asp?id=1277\" alt=\"Landham Road Bridge - Before Construction\" \/><\/p>\n<p>Landham Road Bridge &#8211;&nbsp;During Construction<br \/>\n<img decoding=\"async\" style=\"height: 225px;width: 300px\" src=\"\/images\/image.asp?id=1276\" alt=\"Landham Road Bridge - During Construction\" \/><br \/>\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>September 9, 2013 <a href=\"https:\/\/sudbury.ma.us\/highway\/2013\/09\/16\/update-on-landham-road\/\" aria-label=\"Read full article about Update on Landham Road\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/posts\/13"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/comments?post=13"}],"version-history":[{"count":1,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/posts\/13\/revisions"}],"predecessor-version":[{"id":112,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/posts\/13\/revisions\/112"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/media?parent=13"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/categories?post=13"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/highway\/wp-json\/wp\/v2\/tags?post=13"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}