{"id":1123,"date":"2020-08-25T10:15:06","date_gmt":"2020-08-25T14:15:06","guid":{"rendered":"https:\/\/sudbury.ma.us\/historicalcommission\/?page_id=1123"},"modified":"2022-11-01T14:45:44","modified_gmt":"2022-11-01T18:45:44","slug":"eversource-project-materials","status":"publish","type":"page","link":"https:\/\/sudbury.ma.us\/historicalcommission\/eversource-project-materials\/","title":{"rendered":"Eversource\/MCRT Project Materials"},"content":{"rendered":"<p>The below is information the Historical Commission has requested or been provided related to the proposed construction of the Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail (MCRT) Project. The proposed project would include construction of a new 115-kV underground transmission line and a multi-use path within an existing inactive railroad right-of-way, which will require removal of the existing rails and ties; vegetation clearing; grading; installation of the underground transmission line, duct bank, and manholes; installing a 14-foot-wide gravel base; paving of the 10-foot-wide rail trail; installation of stormwater management features; and site restoration. The Applicants for this proposed project are NSTAR Electric Company d\/b\/a Eversource Energy and the Massachusetts Department of Conservation and Recreation.<\/p>\n<ul>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/MHC-Letter-to-MA-Office-Energy-Enviro-Affairs-170630.pdf?version=be26bc6a1f8c2e64cdebae9b37315885\">MHC Letter to MA Office Energy Environmental Affairs dated June 30, 2017<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/03\/USACE-Email-to-VHB-181120.pdf?version=a0ea2a3708713163bfe6d11c017c9559\">USACE Email to VHB dated November 11, 2018<\/a><\/li>\n<li><a style=\"background-color: #ffffff;font-size: 1rem\" href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-Eversource-201204.pdf?version=16e9b478d0bab1681e328b6dfd93dd4f\">SHC Letter to Eversource dated February 4, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/10\/Sudbury-Hudson-Transmission-Reliability-and-Mass-Central-Rail-Trail-Project-Bridge-Replacements-by-VHB-200527.pdf?version=1973d820632d9b9b885e1342e5c96ee2\">Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail Project Bridge Replacements by VHB dated May 27, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-Eversource-June-17-2020.pdf?version=f7cf350b0d0f50011d5d9896b0aca3ae\">SHC Letter to Eversource dated June 17, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Eversource-MHC-Letter-from-SHC-200723.pdf?version=44c94fdd74d854e46b4f8439597ca07c\">Eversource MHC Letter from SHC dated July 23, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Eversource-Transmission-Reliability-Project-200723-1.pdf?version=abac2439604ba795b0202e8073e7e748\">Eversource Transmission Reliability Project dated July 23, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/10\/Chapter-91-Request-for-Extended-Term-200702.pdf?version=db1fde938800325ea10fff95019fa9a4\">Chapter 91 Request for Extended Term dated July 2, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Request-Recognition-as-Consulting-Party-Eversource-MHC-Letter-from-SHC-200817-1.pdf?version=ec4134049cb5cfc42ed6442f0881c643\">Request Recognition as Consulting Party Eversource MHC Letter from SHC dated August 17, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Eversource-MHC-Letter-from-SHC-200826.pdf?version=0b5011ea630b085f796ac3008d67cd93\">Eversource MHC Letter from SHC dated August 26, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/10\/MassDEP-Notice-of-License-Public-Comment-Notice-for-Bridge-127-200827.pdf?version=b5a197dbc859cd6dea9f523c4444af4a\">MassDEP Notice of License Public Comment Notice for Bridge 127 dated August 27, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/10\/MassDEP-Notice-of-License-Public-Comment-Notice-for-Bridge-128-200827.pdf?version=05f358800d898b6b8bc1fa14ff1307da\">MassDEP Notice of License Public Comment Notice for Bridge 128 dated August 27, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1132\">Massachusetts Historical Commission Response re SHC Comments dated August 10, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1134\">VHB Response Letter (attachments below) dated August 21, 2020<\/a>\n<ul>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1136\">Attachment 1a. Photos of Railroad Features<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1137\">Attachment 1b. Table of Railroad Features<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1138\">Attachment 1c. Bridge Photos<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1139\">Attachment 2. Wayside Inn Station<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1140\">Attachment 3. East Sudbury Station<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/Attachment-4.-ArchaeoReconn-Report-Redacted-Complete.pdf?version=808008601d34dfdaea201b3fe5927488\">Attachment 4. Archaeological Reconnaissance Report (Redacted)<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/Attachment-5.-MCRT-Cultural-Assessment-Redacted.pdf?version=2b5f83134e23eddc6d2940a221af4a8f\">Attachment 5. Mass Central Rail Trail Cultural Resources Assessment (Redacted)<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1141\">Attachment 6. Bridge Design Submittal Letter and Plans dated February 23, 2018<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1142\">Attachment 7. Massachusetts Historical Commission Letter re Memorandum of Agreement dated December 18, 2019<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/Attachment-8.-USACE-Correspondence-Compiled.pdf?version=2ad63473d9b668158b69cd882bb9a88e\">Attachment 8. United States Army Corps of Engineers Correspondence<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1143\">Attachment 9. Tribal Consultations and Coordination<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1144\">Attachment 11. Reports to Tribal Authorities<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1145\">Attachment 13. Boston &amp; Maine Tool House<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/Attachment-19.-Historic-Reconn-Report-12-27-2017.pdf?version=cf97310e9e2a6fdd586a35df94181efd\">Attachment 19. Historic Reconnaissance Report dated December 27, 2017<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/MHC-Response-to-MassDEP-Waterways-Public-Notices-200914.pdf?version=186cc8b92400b6e621453c72fbbc7b83\">Massachusetts Historical Commission Response to MassDEP Waterways Public Notices dated September 14, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/VHB-Response-to-SHC-404-DCR-May-6-2020.pdf?version=ff75d75aad02b7c14d32b7c79fe8f47f\">VHB Response to SHC 404 DCR dated May 6, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-MHC-June-9-2020.pdf?version=abc7f480e45e1e5e2b6b47538210f28f\">SHC Letter to MHC dated June 9, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Eversource-Letter-from-SHC-200924.pdf?version=44c94fdd74d854e46b4f8439597ca07c\">Eversource Letter from SHC dated September 24, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letterto-Waterways-permit-re-Bridges-200924.pdf?version=5d0cb7d835aa220ec1a787e33a5cf471\">SHC Letter to Waterways permit re Bridges dated September 24, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1206\">VHB Response Letter (attachments below) dated September 30, 2020<\/a>\n<ul>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/1-S-H-MCRT-PCN-Compiled-20200731.pdf?version=92990ddc20fba61d321d81c7a186e84b\">Section 404 Pre-Construction Notification Filing with US Army Corps of Engineers<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/wp-content\/uploads\/sites\/342\/2020\/09\/SudtoHud-CH91-Compiled_20200527.pdf?version=6f6d604c26c5f623deeae7cb22b682d8\">Chapter 91 License Applications &#8211; Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail Project: Bridge Replacements by VHB dated May 27, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1211\">Department of Conservation and Recreation Plan Sheet GW-05<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/4-Eversource_Sudbury-NOI-Plans_20200807.pdf?version=c0476b6375c474631402ccf4ad26af8a\">Plan Set for the Sudbury-Hudson Transmission Reliability Project submitted to Conservation Commission dated August 7, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1214\">Sudbury-Hudson Archaeological Intensive (Locational) Survey &#8211; Appendices I and II<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1219\">Preliminary Engineering Review of Bridges 127 and 128 dated October 20, 2016<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/Army-Corps-Letter-from-SHC-200924-Anacheka-Nasemann.pdf?version=4aa596976b08a9df562686ec96b749fa\">USACE Letter from SHC dated September 24, 2020-Anacheka-Nasemann<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2020\/11\/VHB-Response-to-SHC-October-15-Letter-201030.pdf?version=3e08bfce724d7d069f9287def545f2ca\">VHB Response Letter dated October 30, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2020\/11\/BOS_DEP_agenda_public_hearing_11.30.20.pdf?version=d6bf3773b4e62f2b5e642d25834ec1ac\">Select Board Agenda for November 30, 2020 &#8211; Remote Public Hearing with MassDEP&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/Applicants-Draft-MOA-Version-Nov-5-2020.pdf?version=4aa596976b08a9df562686ec96b749fa\">Applicant&#8217;s Draft Member of Agreement Version dated November 5, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-USACE-re-Narragansett-THPO-201210.pdf?version=2188ad3ad50e64caa83d9a479b6fe7fc\">SHC Letter to USACE re Narragansett THPO dated December 10, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/VHBRequest-for-Permit-Area-Determination-201108.pdf?version=2f78e8f0df5f0690c96ece7eb90a23e1\">VHB Request for Permit Area Determination dated November 8, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-USACE-FOIA-MOA-201211.pdf?version=252b6ef33829f4323e47cda702ca2a74\">SHC Letter to USACE FOIA Memorandum of Agreement dated February 11, 2020<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/MBTA-DCR-December-30-2010-Lease-Agreement.pdf?version=abac2439604ba795b0202e8073e7e748\">MBTA DCR Lease Agreement dated December 30, 2010<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-letter-USACE-Dec-30-2020-receipt-applicant-MOA.pdf?version=8dd33d94e05144c0362cdc358706c025\">SHC Letter to USACE dated December 30, 2020 Receipt Applicant MOA<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-USACE-second-FOIA-201230.pdf?version=44d9b1cf0c1e2e073006729ff9f6b011\">SHC Letter to USACE second FOIA dated December 30, 2020<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/e106-Form-2020-Comments-210126.pdf?version=1022460acfa7a4ba4555a17e9f98eca4\">e106 Form 2020-Comments dated January 26, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1338\">VHB Response Letter dated February 1, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-ACHP-210210.pdf?version=f3c8f78714dffded7e0f11e72025103c\">SHC Letter to ACHP dated February 10, 2021<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/e106-Narragansett-THPO-to-ACHP.pdf?version=12cdf558b4ef8176c89687dbe7e9afa3\">e106 Narragansett THPO to ACHP<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/USACE-draft-MOA-to-SHC-April-21-2021.pdf?version=acc57e8489f46a63df4eac2948d28f64\">USACE draft MOA to SHC dated April 21, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/USACE-Letter-to-MHC-SHPO-April-21-2021.pdf?version=acc57e8489f46a63df4eac2948d28f64\">USACE Letter to MHC SHPO dated April 21, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/USACE-Letter-to-SHC-April-21-2021.pdf?version=775ad7d273354aa20c2a9e413bd4d341\">USACE Letter to SHC dated April 21, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-VHB-April-21-2021-re-DCR-404-106.pdf?version=44d9b1cf0c1e2e073006729ff9f6b011\">SHC Letter to VHB re DCR 404 106 dated April 21, 2021<\/a>&nbsp;<\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/D-Elliot-Letter-to-USACE-April-22-2021.pdf?version=2ef3c4b7a85ee9d67c6bee669dc8c592\">D Elliot Letter to USACE dated April 22, 2021<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/03\/VHB-Response-to-SHC-Comments-from-201215.pdf?version=e7725f163e52cfe17cbb070bf60c59ea\">Comment Letter to US Army Corps of Engineers (USACE) dated May 20, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/05\/May-12-2021-HC-Letter-MHC-MOA.pdf?version=8af469bb64b1d2a1ce505484efb5ef2d\">Mass Historical Commission (MHC) Letter dated May 12, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/05\/May-12-2021-Table-to-accompany-MHC-letter.pdf?version=6381d73a66358e39b16135e78620cec5\">Table to accompany MHC letter dated May 12, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/ACHP-Letter-to-USACE-April-30-2021.pdf?version=5472bfc83efe76b80655926b4465fe1a\">ACHP Letter of USACE dated April 30, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/USACE-Revised-MOA-to-SHC-August-6-2021.pdf?version=3c62e1b298f72aefb11af2b8c03a48b9\">USACE Revised Memorandum of Agreement to SHC dated August 6, 2021<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/DCR-Letter-from-SHC-210816-1-1.pdf?version=9baeabebc428ecac32ef3dbf964c54cd\">DCR Letter from SHC dated August 16, 2021<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/DCR-Letter-from-SHC-210818-1.pdf?version=9baeabebc428ecac32ef3dbf964c54cd\">DCR Letter from SHC dated August 18, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/USACE-Paul-Maniccia-Letter-to-SHC-210806.pdf?version=3c62e1b298f72aefb11af2b8c03a48b9\">USACE Paul Maniccia Letter to SHC dated August 6, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-USACE-Paul-Maniccia-210824.pdf?version=52cc1e0356a6788333177412aae76b44\">SHC Letter to USACE Paul Maniccia dated August 24, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/05\/Revi-PDF-Sec-House-Right-of-Way-1.pdf?version=d56749da3150f3c0f498c6c1f4f2723e\">Revised PDF Section House Right of Way<\/a><\/li>\n<li><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/10\/DCR-Letter-to-SHC-Sept-2-2021.pdf?version=1022460acfa7a4ba4555a17e9f98eca4\">DCR Letter to SHC dated September 2, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/09\/Eversource-Section-106-Meeting-Presentation-210928.pdf?version=88d60af415b5857f676658884fd96d0e\">Section 106 Consultation Meeting Presentation dated September 28, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/Section-106-Consultation-Meeting-Recording-210928.mp4?version=968f3b9fc012c44bb59ebc1260f63e20\">Section 106 Consultation Meeting Recording dated September 28, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/10\/SHC-Letter-to-USACE-October-25-2021-r.doc_.pdf?version=faf5c2fdda14c32944430923c2794501\">SHC Letter to USACE dated October 25, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/Sud-Hud-Post-Review-Discoveries-Plan-2021-11-17.pdf?version=413414d34b67cb1be133e95a73b7c8da\">Sudbury-Hudson Post-Review Discoveries Plan dated November 17, 2021<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/SudburyHudson_USACE_PermitArea_Plans_2021-11-18.pdf?version=413414d34b67cb1be133e95a73b7c8da\">Sudbury-Hudson USACE Permit Area Plans dated November 18, 2021<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/Form-A_Central-Mass-RR-in-Hudson_20211119-1.pdf?version=3572182a13d5d91b14a9183e042843e1\">Central Mass RR in Hudson dated November 19, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-admin\/post.php?post=1713&amp;action=edit\">All RR District Features Impacts dated November 22, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-admin\/post.php?post=1713&amp;action=edit\">SHC DOE Letter from USACE dated December 6, 2021<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-HHC.pdf?version=ffe9f4440f7a21eab928a08e2d35861f\">Determination of Effect Letter to Hudson Historical Commission dated December 17, 2021<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-MHC.pdf?version=ffe9f4440f7a21eab928a08e2d35861f\">Determination of Effect Letter to Massachusetts Historical Commission dated December 17, 2021<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-MW.pdf?version=50a6444f7d9b3126c9e1ebec93f20283\">Determination of Effect Letter to Mashpee Wampanoag Tribe dated December 17, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-MWA.pdf?version=50a6444f7d9b3126c9e1ebec93f20283\">Determination of Effect Letter to Wampanoag Tribe dated December 17, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-NIT.pdf?version=8d59dd324595e794af6f4c80c00fe358\">Determination of Effect Letter to Narragansett Indian Tribe dated December 17, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2021\/12\/NAE-2017-01406-20211217-DOE_Letter-SHC.pdf?version=8d59dd324595e794af6f4c80c00fe358\">Determination of Effect Letter to SHC dated December 17, 2021&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/12\/Sud-Hud-Post-Review-Discoveries-Plan-2021-11-17-1.pdf?version=27e4fd1516195a826e30206a6bf09249\">Sudbury Hudson Post-Review Discoveries Plan dated November 17, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2021\/12\/SudburyHudson_USACE_PermitArea_Plans_2021-11-18-1.pdf?version=e9a3be1ca43a2b38e8372a3a6faa2396\">Sudbury Hudson USACE Permit Area Plans dated November 18, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/01\/All-RR-District-Features-Impacts-20211122-1.pdf?version=d48d971b989797418a62185d47c4bf1a\">All RR District Features Impacts dated November 22, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/01\/NAE-2017-01406-20211217-DOE_Letter-SHC-3.pdf?version=173112dd7e0798eaa96c01c937cda77c\">USACE DOE Letter to SHC dated December 21, 2021<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/01\/HC-Letter-USACE-Jan-14-2022-f-1.pdf?version=12a8720fbdaefc4b880eabc81d4e4fed\">SHC Letter to USACE dated January, 14 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/02\/MHC-Letter-to-USACE-220210.pdf?version=4ca10ec3025572339174ee1cbf544006\">MHC Letter to USACE dated February 10, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/02\/HPAPP-2.11.22.pdf?version=7cb0bf0f0b453004a22853c927ad8667\">Historic Properties Avoidance and Protection Plan dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/MCRT-DCR-Plans-2.11.22.pdf?version=7e7ba76ead7fd8df320f34e5f3c47311\">Mass Central Rail Trail Department of Conservation and Recreations Plans dated February 17, 2022&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/02\/NAE-2017-01406_S-H-MCRT-MOA_DRAFT-v.3_26JAN2022.pdf?version=e6d117c13a1c1541063d39d86015ba83\"><em>DRAFT<\/em> Memorandum of Agreement between USACE and MHC dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/NAE-2017-01406-20220215-Response_to_SHC_Comments.pdf?version=75a7f41b75f96cb41c97bfc408fe1b69\">USACE response to SHC Comments February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/NAE-2017-01406-20220215-Revised_MOA_Transmittal.pdf?version=75a7f41b75f96cb41c97bfc408fe1b69\">USACE Memo re Revised Memorandum of Agreement and Response to Comments dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/Post-Review-Discoveries-Plan-2.11.22.pdf?version=78524901b757e6717a6d9ea27b36350e\">Post-Review Discoveries Plan dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/Updated-Project-Impacts-to-Railroad-Features-2.11.22.pdf?version=495d8b6f8825f20705434815d89b6b2c\">Updated Project Impacts to Railroad Features Spreadsheet dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/02\/IFC-PLANS-SUD-HUD-2-3-2022-part-1-of-2_Stamped_REV1.pdf?version=21b223c1e3c94ec7bbeff5d0c6b8cafd\">Eversource Sudbury-Hudson Transmission Reliability Project Plan Set-Part 1 dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/02\/IFC-PLANS-SUD-HUD-2-3-2022-part-2-of-2_Stamped_REV1-11x17-1.pdf?version=a77468f9a95d3e8d0deaa37270e4a952\">Eversource Sudbury-Hudson Transmission Reliability Project Plan Set-Part 2 dated February 17, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/03\/SHC-Response-to-USACE-email-Feb-25-2022-27.pdf?version=aa0efd39870cee6b8f78b6e6d2ae6bad\">SHC Response to USACE email dated February 25, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/03\/SHC-Edit-MOA-March-2022.pdf?version=5fb1a97d5fe564ff46dc3c935087e416\">SHC Memorandum of Agreement dated March 15, 2022<\/a><\/li>\n<li><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/300\/2022\/03\/SHC-Letter-to-USACE-March-2022.pdf?version=08b1f7e8a7778656c1bf30f9fb98a0e1\">SHC Letter to USACE dated March 15, 2022<\/a><\/li>\n<li><a href=\"https:\/\/youtu.be\/zDsZ34vqNa4\">Section 106 Consultation Meeting Recording dated March 16, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/03\/Eversource-Section-106-Meeting-Presentation-220316.pdf?version=c973b6697172d47f664b0bdc17d13519\">Eversource Section 106 Meeting Presentation dated March 16, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/03\/USACE-Section-106-Meeting-Presentation-220316.pdf?version=c973b6697172d47f664b0bdc17d13519\">USACE Section 106 Meeting Presentation dated March 16, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/04\/NAE-2017-01406-20220214-ACHP_FORM.pdf?version=b0f8e49e41e855507879e19c4ea610b5\">Advisory Council of Historic Preservation e106 Form<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/04\/Select-Board-Letter-re-USACE-from-SHC-220425.pdf?version=11447f93833b029808de623f6b98a665\">Select Board Letter re USACE from SHC dated April 25, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/05\/USACE-Letter-from-Select-Board-220520.pdf?version=71a5bdc97517c65fc0dd767d3fb971d0\">USACE Letter from Select Board dated May 20, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=2004\">Select Board Letter from USACE dated May 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/06\/MOA-USACE-Cover-Letter-220527.pdf?version=25b7d5ad8a2834affbc7ca5b5bc0f4f9\">Memorandum of Agreement USACE Cover Letter dated May 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/06\/MOA-USACE-220527.pdf?version=25b7d5ad8a2834affbc7ca5b5bc0f4f9\">Memorandum of Agreement USACE dated May 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/06\/USACE-Permit-Area-Plans-220527.pdf?version=1070d81fcfb34e3ba79a6225cb185f0d\">USACE Permit Area Plans dated May 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/06\/USACE-Letter-from-ACHP-220608.pdf?version=bbc13046a17f0edc212dfda677bb7ddd\">USACE Letter from the Advisory Counsel of Historic Preservation dated June 8, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1970\">USACE Letter from MHC dated June 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/?p=1964\">USACE Letter from SHC dated June 28, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/07\/MHC-Letter-from-SHC-220707.pdf?version=f273eb1efb794372a229af95abed964e\">MHC Letter from SHC dated July 7, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/07\/USACE-Letter-to-Select-Board-220527-1.pdf?version=03e4e3366902e44dd3284236d969e24d\">UCASE Letter to Select Board dated May 27, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-20220729-USACE-to-MHC.pdf?version=507cb598d86a75d2d8baa70591deabe4\">USACE to MHC dated July 29, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-20220729-USACE-to-SHC.pdf?version=507cb598d86a75d2d8baa70591deabe4\">USACE to SHC dated July 29, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-HHC_MOACover-1.pdf?version=003c7f8270a7d0127a9f46b766679994\">Hudson Historical Commission Memorandum of Agreement Cover Letter dated July 29, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-MWT_MOACover.pdf?version=0978c19dd682759082c99cd2ea94ab84\">Mashpee Wampanoag Tribe Memorandum of Agreement Cover Letter dated July 29, 2022&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-NIT_MOACover-1.pdf?version=790d4a703124a0166432fe5df1531132\">Narragansett Indian Tribe Memorandum of Agreement Cover Letter dated July 29, 2022&nbsp;<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-WTGHA_MOACover-1.pdf?version=0d8e7c69fdc2bf680e9f61e176b94ee9\">Wampanoag Tribe of Gay Head Aquinnah Memorandum of Agreement Cover Letter dated July 29, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-20220729-Final_MOA.pdf?version=61616c1bc39b5a8e03516d0192a69987\">Memorandum of Agreement USACE dated July 29, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/Section-Tool-House-Close-up.pdf?version=8baaea48406bc8491a3fd4834dccbaa0\">Section Tool House Plan Close Up<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-Bridge128Design-1.pdf?version=1206216aaba91170a6bd0b2089ecba15\">Bridge 128 Plans<\/a>&nbsp;<\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/SHC-Letter-to-USACE-220818.pdf?version=a016d25c81450c8a2b4512ac006cd6fe\">USACE Letter from SHC dated August 18, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/Crew-1937-1-1.jpg?version=0e5e1493f34d61f809e03a3d43708c91\">PHOTO: B&amp;M Section House Crew 1937<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-20220729-Final_MOA-1.pdf?version=90bed82dea09cf2acdb0c8efb0fa1aeb\">Memorandum of Agreement USACE dated August 26, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/08\/NAE-2017-01406-20220826-USACE-to-CPs-Design-Update.pdf?version=4a05bf879f81eb46723a2b5cd692c109\">USACE Letter to Consulting Parties re Design Update dated August 26, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/09\/NAE-2017-01406-20220826-USACE-to-MHC-Design-Update-1.pdf?version=591e306ce3ba3ba1e1cb4f4ccda42ec8\">USACE to MHC Design Update August 26, 2022<\/a><\/li>\n<li><a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/wp-content\/uploads\/sites\/300\/2022\/11\/NAE-2017-01406-20221019_Executed_MOA.pdf?version=54ba26301c6d6120f3635f077efcd883\">Executed Memorandum of Agreement October 19, 2022<\/a>&nbsp;<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The below is information the Historical Commission has requested or been provided related to the proposed construction of the Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail (MCRT) Project. The proposed project would include construction &hellip; <a href=\"https:\/\/sudbury.ma.us\/historicalcommission\/eversource-project-materials\/\" aria-label=\"Read full article about Eversource\/MCRT Project Materials\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":202,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false},"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/pages\/1123"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/users\/202"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/comments?post=1123"}],"version-history":[{"count":236,"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/pages\/1123\/revisions"}],"predecessor-version":[{"id":2170,"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/pages\/1123\/revisions\/2170"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/historicalcommission\/wp-json\/wp\/v2\/media?parent=1123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}