{"id":1885,"date":"2026-08-10T10:16:22","date_gmt":"2026-08-10T14:16:22","guid":{"rendered":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/?p=1885"},"modified":"2026-08-10T10:17:33","modified_gmt":"2026-08-10T14:17:33","slug":"lower-feeley-field-construction","status":"publish","type":"post","link":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/2026\/08\/10\/lower-feeley-field-construction\/","title":{"rendered":"Lower Feeley Field Construction"},"content":{"rendered":"<h5>Construction<\/h5>\n<p><strong>August &#8211; October 2026<\/strong><\/p>\n<p>&nbsp;<\/p>\n<h5>Improvements<\/h5>\n<ul>\n<li>Accessible path from parking lot to far field<\/li>\n<li>Dugout improvements<\/li>\n<li>New fencing along 1st and 3rd base sides<\/li>\n<li>Backstop improvements<\/li>\n<li>Improved drainage<\/li>\n<li>New irrigation system<\/li>\n<li>Improved playing field surface<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h5>Field Closure<\/h5>\n<p><strong>Now through Summer 2027<\/strong>. Following construction, Lower Feeley Field will remain closed to allow new grass to become fully established.<\/p>\n<p>&nbsp;<\/p>\n<p>Please observe all posted signs and stay clear of the work area for safety.<\/p>\n<p>Thank you for your patience during the construction and closure. We look forward to reopening an improved field in Summer 2027!<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1886 size-full\" src=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27.png?version=e50eb8f0eda6f74fa2873c3f04cac7fb\" alt=\"\" width=\"1536\" height=\"1024\" srcset=\"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27.png 1536w, https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27-300x200.png 300w, https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27-1024x683.png 1024w, https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27-768x512.png 768w, https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-content\/uploads\/sites\/324\/2026\/08\/Feeley-Field-Construction-Closure-26-27-450x300.png 450w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction is scheduled to begin August 10, 2026. Field closure anticipated through Summer 2027. <a href=\"https:\/\/sudbury.ma.us\/parkrecreationcommission\/2026\/08\/10\/lower-feeley-field-construction\/\" aria-label=\"Read full article about Lower Feeley Field Construction\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":81,"featured_media":1887,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/posts\/1885"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/comments?post=1885"}],"version-history":[{"count":2,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/posts\/1885\/revisions"}],"predecessor-version":[{"id":1889,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/posts\/1885\/revisions\/1889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/media\/1887"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/media?parent=1885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/categories?post=1885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/parkrecreationcommission\/wp-json\/wp\/v2\/tags?post=1885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}