{"id":1811,"date":"2017-09-27T18:35:11","date_gmt":"2017-09-27T22:35:11","guid":{"rendered":"https:\/\/sudbury.ma.us\/pcd\/?p=1811"},"modified":"2017-10-17T16:17:29","modified_gmt":"2017-10-17T20:17:29","slug":"bfrt-update-info","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/pcd\/2017\/09\/27\/bfrt-update-info\/","title":{"rendered":"Bruce Freeman Rail Trail Sudbury Information"},"content":{"rendered":"<p><span style=\"color: black;font-family: 'Arial',sans-serif;font-size: 10pt\">The Bruce Freeman Rail Trail (BFRT) will be a 25-mile rail trail between Lowell and Framingham, along the former Lowell Secondary Track right-of-way of the Old Colony Railroad. In Sudbury, the rail corridor extends though the center of Town, approximately 4.4 miles from South Sudbury near Route 20, north to the Sudbury\/Concord Town line. The Town is in the process of designing the trail which will be constructed with State and Federal support. <\/span><\/p>\n<p><span style=\"color: black;font-family: 'Arial',sans-serif;font-size: 10pt\">In&nbsp;May 2017, the project was placed on the 2018-2022 Transportation Improvement Program (TIP)&nbsp;of the Boston Metropolitan Planning Organization (MPO)&nbsp;committing construction funding during Federal Fiscal Year 2022.&nbsp; If MPO schedule modifications occur, it is possible the project could advance to construction&nbsp;sooner.<\/span><\/p>\n<p>In September 2017, the 25% Design Submission (see links below) was sent to MassDOT to initiate their formal review.&nbsp; MassDOT will hold a Design Public Hearing in Sudbury once their comments have been addressed by the Design Team.<\/p>\n<p><span style=\"font-size: 10pt\"><em><strong><span style=\"color: black;font-family: 'Arial',sans-serif\">If you wish to learn more about the project, please see the links to resources&nbsp;below.<\/span><\/strong><\/em><\/span><\/p>\n<p><em><strong>Please see the <a href=\"https:\/\/sudbury.ma.us\/bfrt\/\">BFRT Design Task Force Meeting<\/a> webpage for information on the Task Force.<\/strong><\/em><\/p>\n<p><span style=\"font-size: 10pt\"><em><strong><span style=\"color: black;font-family: 'Arial',sans-serif\">Please sign up for <a href=\"https:\/\/sudbury.ma.us\/email-lists\/bfrt\/\"><span style=\"text-decoration: underline\">email notification <\/span><\/a>regarding the Sudbury BFRT project, if you are interested in receiving project updates.<\/span><\/strong><\/em><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong><br \/>\n25% Design Plans Submitted to MassDOT, September 2017<br \/>\n<\/strong><\/span><\/span><\/p>\n<p style=\"text-align: left\">Town Letters to MassDOT:&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1819\">September 8, 2017<\/a><\/span>&nbsp;and&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1813\">September 15, 2017<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/608164-BFRT-25-Submission-Redux.pdf?version=e982ccaba0b3e43cd1c764f74bc56084\">25% Design Plan Set<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/25-Submission-Booklet-Redux.pdf?version=96eed90872b34839fd673b40bd465990\">25% Design Submission Booklet (Highway, Environmental, and Traffic Checklists, Construction Cost Estimate, and Parking Memo)<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1815\">Functional Design Report<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/HopBrook-Prelim-Structures-Report-Redux.pdf?version=89b476730f38a0d1d0de2a0dd3e8c56c\"><span style=\"color: #0066cc;text-decoration: underline\">Hop Brook Preliminary Structures Report&nbsp;<br \/>\n<\/span><\/a><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Type-Study-Report-Sudbury-BFRT-over-Pantry-Brook-For-Printing.pdf?version=91eb1095a1e3d1384d7fc63f5916f8ab\">Pantry Brook Bridge Type Study Report<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1814\">25% Design&nbsp;Right of Way (ROW)&nbsp;Plans<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/608164-BFRT-25-Color-Utility-Submission-Opti.pdf?version=331de4432a3d2ba6a8c53650a9e3d66f\">25% Design Utility Plans<\/a><\/span><br \/>\n<span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong><br \/>\nOther Documents, September 2017<br \/>\n<\/strong><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Final-Response-to-25Town-Comments.pdf?version=6c3d83d2402496ce098a35654da305b7\">Designer (VHB) Response to Town Comments<\/a>&nbsp;<\/span><br \/>\n<span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"> <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/WetlandImpacts9.25.17.pdf?version=2e0e9d8d1afab8c120634724b4d5b861\"><span style=\"text-decoration: underline\">Estimated Wetlands Impacts<\/span><br \/>\n<\/a><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Floodplain-Impacts-9.25.17.pdf?version=2e0e9d8d1afab8c120634724b4d5b861\">Estimated Floodplain Impacts<\/a><\/span><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/WetlandImpacts9.25.17.pdf?version=2e0e9d8d1afab8c120634724b4d5b861\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n&nbsp;<\/span><\/span><\/span><\/span><\/a><\/span><\/span><\/span><\/span><\/p>\n<p style=\"text-align: left\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>Preliminary Design Plans<\/strong><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000;text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1513\">Preliminary Design Memo from VHB<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1520\"><span style=\"font-size: small\">Preliminary Design Plans Overview<\/span>&nbsp;Presentation Identifying Some&nbsp;Challenge Areas<\/a><br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000;text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1517\">Preliminary Design Plans<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1519\">Preliminary Profiles<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1518\">Preliminary Cross Sections<br \/>\n<\/a><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2014\/11\/Preliminary-Roadway-Crossing-Plans-Feb-2017.pdf?version=8d823876e2d8072925b38c292365a205\">Preliminary Roadway Crossing Plans Feb 2017<\/a><\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>Alternatives Analysis<br \/>\n<\/strong><\/span><\/span><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2014\/11\/25\/bruce-freeman-rail-trail-update-info\/figure1_alternatives_ev_11x17\/\">Potential Roadway Alternative Routes <\/a><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>Design Process<br \/>\n<\/strong><\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/proposal-request\/\"><u><span style=\"color: #0563c1\">Proposal Request \u2013 25% Design BFRT<\/span><\/u><\/a><span style=\"color: #000000\">; September 10, 2014<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/vhb-final-proposal-combined\/\"><u><span style=\"color: #0563c1\">Accepted Proposal Response &#8211; VHB<\/span><\/u><\/a><span style=\"color: #000000\">; October 3, 2014<\/span><\/span><b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&nbsp;<\/span><\/span><\/b><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">Communications\/Correspondence<br \/>\n<\/span><\/span><\/b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1522\">October Update Memo &#8211; BOS Meeting<\/a><\/span>; November 1, 2016<\/span><\/span><b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n<\/span><\/span><\/b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1375\">August Update Memo &#8211; VHB<\/a><\/span>; August 31, 2016<\/span><\/span><b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n<\/span><\/span><\/b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2014\/11\/25\/bruce-freeman-rail-trail-update-info\/post-dep-soc_-abrams-et-al-v-sudbury-conservation-commission-et-al\/\"><u><span style=\"color: #0563c1\">Town Counsel Opinion on Superseding Order of Conditions<\/span><\/u><\/a><span style=\"color: #000000\">; August 7, 2015<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1350\"><u><span style=\"color: #0563c1\">MassDOT Letter<\/span><\/u><\/a><span style=\"color: #000000\">; May 5, 2015<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=350\"><u><span style=\"color: #0563c1\">MassDOT Letter<\/span><\/u><\/a><span style=\"color: #000000\">; May 1, 2014<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&nbsp;<\/span><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&nbsp;<\/span><\/span><\/p>\n<p><b><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">BFRT Meetings<br \/>\n<\/span><\/span><\/b><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-size: medium\">Bruce Freeman Rail Trail Meeting; March 9, 2017 <\/span><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/02\/16\/bruce-freeman-rail-trail-public-meeting\/\"><u><span style=\"color: #0066cc;font-size: medium\">Meeting Flier<\/span><\/u><\/a><\/span><\/span>&nbsp; <a href=\"https:\/\/sudbury.ma.us\/pcd\/2017-03-09-meeting-notes\/\"><span style=\"text-decoration: underline\">Notes<\/span><\/a><br \/>\n<\/span><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1138\">Bruce Freeman Rail Trail Meeting<\/a><\/span>; November 29, 2016&nbsp;&nbsp;&nbsp;<br \/>\n<a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1072\"><u><span style=\"color: #0563c1\">Bruce Freeman Rail Trail Design Charrette<\/span><\/u><\/a><span style=\"color: #000000\">; August 25, 2016<span style=\"font-size: small\">&nbsp;&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1524\">Notes<\/a><\/span><\/span><br \/>\n<\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1020\"><u><span style=\"color: #0563c1\">Bruce Freeman Rail Trail Meeting<\/span><\/u><\/a><span style=\"color: #000000\">; June 21, 2016&nbsp;&nbsp;<span style=\"font-size: small\">&nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1523\">Presentation<\/a>&nbsp;<\/span><\/span><br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2014\/12\/Forum-Flyer.pdf\"><u><span style=\"color: #0563c1\">Rails to Trails Public Forum<\/span><\/u><\/a><span style=\"color: #000000\">; January 22, 2015&nbsp;&nbsp;<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&#8211;<\/span><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2015\/02\/Sudbury-Rails-to-Trails-Forum_Minutes-doc.pdf\"><u><span style=\"color: #0563c1\">Rails to Trails Forum Minutes<\/span><\/u><\/a><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><strong>Other Items<\/strong><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=351\"><u><span style=\"color: #0563c1\">Town Meeting CPC Appropriation Vote<\/span><\/u><\/a><span style=\"color: #000000\">; May 7, 2014<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/selectboard\/selectboard-2014-04-08-minutes\/\"><u><span style=\"color: #0563c1\">Board of Selectmen BFRT Gift Acceptance Vote<\/span><\/u><\/a><span style=\"color: #000000\">; April 8, 2014 (begins on page 5)<\/span><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\">&nbsp;<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Updates and information on the Sudbury section of the Bruce Freeman Rail Trail <a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/09\/27\/bfrt-update-info\/\" aria-label=\"Read full article about Bruce Freeman Rail Trail Sudbury Information\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":134,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/1811"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/users\/134"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/comments?post=1811"}],"version-history":[{"count":15,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/1811\/revisions"}],"predecessor-version":[{"id":1841,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/1811\/revisions\/1841"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/media?parent=1811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/categories?post=1811"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/tags?post=1811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}