{"id":354,"date":"2024-02-14T16:16:28","date_gmt":"2024-02-14T21:16:28","guid":{"rendered":"https:\/\/sudbury.ma.us\/pcd\/?p=354"},"modified":"2026-03-06T09:13:22","modified_gmt":"2026-03-06T14:13:22","slug":"bruce-freeman-rail-trail-update-info-2","status":"publish","type":"post","link":"https:\/\/sudbury.ma.us\/pcd\/2024\/02\/14\/bruce-freeman-rail-trail-update-info-2\/","title":{"rendered":"Bruce Freeman Rail Trail Sudbury Information"},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-2376 size-full\" src=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Page-Header-Image.jpg?version=84682f704d0aa1a4b17f25af590202fb\" alt=\"Bringing the Bruce Freeman Rail Trail to Sudbury\" width=\"900\" height=\"600\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Page-Header-Image.jpg 900w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Page-Header-Image-300x200.jpg 300w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Page-Header-Image-768x512.jpg 768w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Page-Header-Image-450x300.jpg 450w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/p>\n<p><span style=\"color: #eb0000\"><strong>USE AT YOUR OWN RISK:<\/strong><\/span> <strong>The recently constructed portion of the Bruce Freeman Rail Trail in Sudbury is now open for public use but \u201cat your own risk\u201d. The Town is waiting for the State to finalize the current contract and transfer responsibility for maintenance of the trail over to the Town, which is expected in September 2025. Please stay tuned for periodic updates \u2013 a GRAND OPENING is expected later this summer or early fall.<\/strong><\/p>\n<p>The Bruce Freeman Rail Trail (BFRT) will be a 25-mile rail trail between Lowell and Framingham, along the former Lowell Secondary Track right-of-way of the Old Colony Railroad (<a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Status-maps.pdf?version=dd7a9ffd5c4dad685aa8fa5db8f67da0\">Full BFRT Corridor Map and Status<\/a>). In Sudbury, the rail corridor extends through the center of Town, approximately 4.4 miles from South Sudbury near Route 20, north to the Sudbury\/Concord Town line (<a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/1-BFRT-Locus-Map-Sudbury.pdf?version=096f23802aa0fbbd05818af661b989c1\">Sudbury BFRT Project in Design Map<\/a>). The BFRT will be constructed with State and Federal support.&nbsp; The project remains on schedule to commence construction later in 2022 or early 2023.&nbsp;<\/p>\n<p>The project is on the 2021-2025 Transportation Improvement Program (TIP) of the Boston Metropolitan Planning Organization (MPO) committing construction funding during Federal Fiscal Year 2022.&nbsp; This means the project has been awarded approximately $12 million dollars for construction of the 4.4-mile rail trail.<\/p>\n<p>**************************************************************************<\/p>\n<p>The Planning &amp; Community Development Department intends to post periodic project updates to this page on the Town\u2019s website. Additionally, the Planning &amp; Community Development Department has created a Bruce Freeman Rail Trail Project Updates email list where periodic updates will be pushed out to interested parties.&nbsp;If you or someone you know are interested in receiving Bruce Freeman Rail Trail updates you can <a href=\"https:\/\/visitor.r20.constantcontact.com\/manage\/optin?v=001i6pY1oARoQIeN_zYNIG6NNvU99J70D_D\"><u>subscribe here<\/u><\/a><span style=\"font-size: 1rem\">&nbsp;(or <\/span><a href=\"https:\/\/visitor.r20.constantcontact.com\/manage\/optin?v=001i6pY1oARoQIeN_zYNIG6NNvU99J70D_D\"><span style=\"text-decoration: underline\">unsubscribe<\/span><\/a><span style=\"font-size: 1rem\">), choose your mailing <\/span><span style=\"font-size: 1rem\">group(s) and, click <a href=\"https:\/\/visitor.r20.constantcontact.com\/manage\/optin?v=001i6pY1oARoQIeN_zYNIG6NNvU99J70D_D\"><span style=\"text-decoration: underline\">Sign Up<\/span><\/a> to receive future updates.&nbsp; &nbsp; &nbsp; <\/span><\/p>\n<p><span style=\"font-size: 1rem\">&nbsp; &nbsp; &nbsp; <a href=\"#FANDOREPORTS\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft wp-image-3204\" src=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2.png?version=d728ec5f130e5d8dc51477f5b03d0ab5\" alt=\"Fuss and Oneill Field Inspection Reports\" width=\"198\" height=\"198\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2.png 1181w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2-300x300.png 300w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2-1024x1024.png 1024w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2-150x150.png 150w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/2-2-768x768.png 768w\" sizes=\"(max-width: 198px) 100vw, 198px\" \/><\/a>&nbsp;&nbsp;<a href=\"#PROJECTPLANS\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft wp-image-3197\" src=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1.png?version=3279a050afb5625aba24c112367eb622\" alt=\"Bruce Freeman Rail Trail Project plans\" width=\"199\" height=\"199\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1.png 1181w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1-300x300.png 300w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1-1024x1024.png 1024w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1-150x150.png 150w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/1-1-768x768.png 768w\" sizes=\"(max-width: 199px) 100vw, 199px\" \/><\/a><\/span>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp; &nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline\"><strong>BRUCE FREEMAN RAIL TRAIL PROJECT UPDATES<\/strong><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><strong>February 20, 2026 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-260219.pdf?version=40af5cd28f6b0e728c4cc2cffb09fd26\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Project, Winter 2026<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>October 22, 2025 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Images-for-Library-Program.-REDUCED-5-PDF.pdf?version=72d8fedc97df648022462a87d4e3635f\"><span style=\"text-decoration: underline\">&#8220;Tales of the Rail Trail &#8211; PowerPoint Presentation&#8221;<\/span><\/a><\/p>\n<p>From 2016 to 2025, Sudbury resident and Rail Trail Advocate Len Simon documented construction of the Bruce Freeman Rail Trail (the north\/south trail that intersects with the east\/west Mass Central Rail Trail near Route 20\/Boston Post Road). He recently presented a slide show in the Goodnow Library Community Room and has graciously shared his presentation with the Rail Trails Advisory Committee.&nbsp;<\/p>\n<p><span style=\"text-decoration: underline\"><strong>August 7, 2025 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-250806.pdf?version=068a4e2a7d4773b4b0240b8d290f2867\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Projects, August 6, 2025<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/PSA-What-is-a-HAWK-Signal.pdf?version=6ee52aa57cbe801977532cb7f6891fad\"><span style=\"text-decoration: underline\">Hawk Signals &#8211; Locations &amp; How Hawk Signals Work<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>February 18, 2025 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-250218.pdf?version=b78d60eb47226a7f1e541673bff2acd0\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Projects, February 18, 2025<\/span><\/a><\/p>\n<p><strong><span style=\"text-decoration: underline\">July 29, 2024 Update:<\/span><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-240725.pdf?version=9941c52657494f9f2de17967cb2d0a54\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Projects, July 25, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/BFRT-Update-Summer-July-2024.pdf?version=c1b46928f2575bad4cbef62149f4ef5c\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of the Bruce Freeman Rail Trail construction work<\/p>\n<p><span style=\"text-decoration: underline\"><strong>July 18, 2024 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Bruce-Freeman-Rail-Trail-Phase-3-Final-25-Design-Plans.pdf?version=98c6d43fcce8b004c2a161659b5e09d4\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail &#8211; Phase 3 Submitted 25% Design Plans<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>May 9, 2024 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-240509.pdf?version=dae41c101aa09f8ec28eb2ce5646b508\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Projects, May 9, 2024<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>February 15, 2024 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/BFRT-Phase-3-Preliminary-25-design.pdf?version=018f30a4efbf81b9a8f46e312fd3c8c0\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail &#8211; Phase 3 Preliminary 25% Design Plans<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Update-Sudbury-Rail-Trails-Memo-240215.pdf?version=90bfeacfc843babd385beae3b5ba6a8c\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trails Projects, February 15, 2024<\/span><\/a>&nbsp;<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/BRUCE-FREEMAN-RAIL-TRAIL-Update-Feb-2024.pdf?version=de0b7daf73b9628265b8a0e2bba803dd\"><span style=\"text-decoration: underline\">Photos<\/span> <\/a>of the Bruce Freeman Rail Trail construction work<\/p>\n<p><span style=\"text-decoration: underline\"><strong>December 12, 2023 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/BFRT-Phase-3-Site-Visit-Photos-of-231102.pdf?version=e9c93a5da774550f2d8f6b334d3a51b4\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail &#8211; Site Visit Photos -November 2, 2023.<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Update-Sudbury-Rail-Trails-Memo-231115.pdf?version=bbeea00eb9e034ff4990990a3d134623\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trail Projects, November 15, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Bruce-Freeman-Rail-Trail-Sudbury-A-VISUAL-HISTORY-PART-2.pdf?version=b30fbc88bc88bfefa9f00c1e9a95d247\"><span style=\"text-decoration: underline\">History Presentation of the Bruce Freeman Rail Trail Part 2 \u2013 September 2023 \u2013 November 2023&nbsp;<\/span><\/a><\/p>\n<p><strong><span style=\"text-decoration: underline\">October 11, 2023 Update:<\/span><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Update-Sudbury-Rail-Trails-Memo-231011.pdf?version=50fc92b3360a8bd72c70110760979858\"><span style=\"text-decoration: underline\">Memo &#8211; Update on Sudbury Rail Trail Projects, October 11, 2023<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>October 6, 2023 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Power-Point-History-of-BFRT-Presentation-231006.pdf?version=8206cb6af25eafd6e2875d47213b8dab\"><span style=\"text-decoration: underline\">History Presentation of Bruce Freeman Rail Trail 2014-2023<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><strong>August 14, 2023 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/BFRT-Update-week-of-230814.pdf?version=2ab19fe4fcce7e60b51117627979781a\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of May 15, 2023.<strong>&nbsp;<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong>July 18, 2023 Update:<\/strong><\/span><\/p>\n<p>MassTrails Grant &#8211; Bruce Freeman Rail Trail Phase 3 has been awarded a <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/07\/MassTrails-2023_Town-of-Sudbury_Award-Letter.pdf?version=aa2463a176bd14624779ce3036116618\"><span style=\"text-decoration: underline\"><strong>2023 MassTrails Grant<\/strong><\/span><\/a> in the amount of $192,000.00.<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/07\/Sudbury-BFRT-Phase-3-Feasibility-Study.pdf?version=1f809d3abcea4bb24ed612283934a90e\"><span style=\"text-decoration: underline\"><strong>BFRT Phase 3 Feasibility Study<\/strong><\/span><\/a> prepared by Fuss &amp; O&#8217;Neill.<\/p>\n<p><span style=\"text-decoration: underline\"><strong>May 20, 2023 Update:<\/strong><\/span><\/p>\n<p>Bruce Freeman Rail Trail Phase 2D Groundbreaking Event<\/p>\n<ul>\n<li>SATURDAY, MAY 20, 2023<\/li>\n<li>10AM &#8211; 11:30AM<\/li>\n<li>Parkinson Field (north side of Hudson Road)<\/li>\n<\/ul>\n<p>Please note there is an access driveway to the municipal field and parking area between 40 and 46 Hudson Road which is identified with white \u201cField Entrance\u201d signs.&nbsp;<\/p>\n<p>Event attendees should use this driveway to access the municipal parking area. The field is just beyond the parking area. Attendees should not use any other private residence or business driveways to park or access the municipal parking lot for the event. Nor should people park along Hudson Road.<\/p>\n<p><em>Message from MassDOT:<\/em><\/p>\n<p>On Saturday, May 20, at 10:00 a.m., Transportation Secretary &amp; CEO Gina Fiandaca will join elected officials and municipal leaders in the Town of Sudbury for a ceremonial groundbreaking event for the Bruce Freeman Rail Trail (Phase 2D) Bike Path Construction project. The project involves construction of a 5.1-mile trail, from Powder Mill Road in Concord to Station Road in Sudbury. The trail will be a 10-foot wide paved shared-use path, which is consistent with the Bruce Freeman Rail Trail in Concord and Acton. The work on the project will include improvements to two structures as well as upgrades to several at-grade crossings including Route 117 (North Road), Pantry Road, and Route 27 (Hudson Road).<\/p>\n<p><em>Message from Friends of the Bruce Freeman Rail Trail:<\/em><\/p>\n<p>Join us on Saturday May 20th at the Bruce Freeman Rail Trail Phase 2D \u201cgroundbreaking event\u201d in Sudbury from 10am \u2013 11:30am (rain or shine).<br \/>\nMassDOT has scheduled this official ceremony for residents to celebrate the start of 5.5 miles of construction for this fantastic community facility. The event program will feature several speakers, including Secretary of Transportation Gina Fiandaca; plus, light refreshments will be served. See you there!<\/p>\n<p><span style=\"text-decoration: underline\"><strong>May 12, 2023 Update:<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-230424.pdf?version=6f51abc5216dcf92a3957ece594296d1\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of April 24, 2023.<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Bruce-Freeman-Rail-Trail-Presentation-230511.pdf?version=940caf9476df1d82d157369fb8f949e1\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail Guide Presentation<\/span>&nbsp;<\/a><\/p>\n<p><strong>April 25, 2023 Update:<\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-230328.pdf?version=8e4b589be0e09736305501ed92e135d9\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of March 28, 2023.<\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-230419.pdf?version=4792bdf51e1f6ae856b6f9ac2d084435\">Photos<\/a><\/span> of Phase 2D Bruce Freeman Rail Trail construction work during the week of April 19, 2023.<\/p>\n<p><strong>April 5, 2023 Update:<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-230331.pdf?version=5431b13bbe2a89911c9c256b17ee6e55\">Photos<\/a><\/span> of Phase 2D Bruce Freeman Rail Trail construction work during the week of March 31, 2023.<\/p>\n<p><strong>March 30, 2023 Update: <\/strong><\/p>\n<p>Two updates for this week regarding the ongoing construction of Phase 2D of the Bruce Freeman Rail Trail.<\/p>\n<p>First, this is another friendly reminder that since we are now into active construction on the Bruce Freeman Rail Trail, people should&nbsp;<strong><u>NOT<\/u><\/strong>&nbsp;be accessing the rail corridor or actively using it. It is simply too dangerous and, at a minimum, we do not want people traversing an active construction site and getting in the way of the workers and\/or their machinery. As such, we ask that people avoid walking on or crossing the rail corridor until the rail trail construction project is completed.<\/p>\n<p>Second, railroad rail removal throughout the entire corridor will be continuing for the next 3-4 weeks. As many of you probably have seen, the stacks of old rails near the Hudson Road\/Peakham Road intersection are being\/have been removed this week. During the week of April 3, 2023, the installation of erosion controls will commence along with ongoing tree clearing throughout the corridor.<\/p>\n<p><strong>March 20, 2023 Update:<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-230310.pdf?version=ed445539353372697911cdc87089521e\">Photos<\/a><\/span> of Phase 2D Bruce Freeman Rail Trail construction work during the week of March 10, 2023.<\/p>\n<p><strong>March 9, 2023 Update:<\/strong><\/p>\n<p>This is a friendly reminder that since we are now into active construction on the Bruce Freeman Rail Trail, people should <strong><u>NOT<\/u><\/strong> be accessing the rail corridor or actively using it. It is simply too dangerous and, at a minimum, we do not want people traversing an active construction site and getting in the way of the workers and\/or their machinery. As such, we ask that people avoid walking on and crossing the rail corridor until the rail trail construction project is completed.<\/p>\n<p><strong>February 17, 2023 Update:<\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Bruce-Freeman-Rail-Trail-Construction-Work-Photos-Week-of-230213.pdf?version=d110d77dfec6450fca63510ff1f3a284\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of February 13, 2023.<\/p>\n<p><strong>February 8, 2023 Update:<\/strong><\/p>\n<p>Construction activity on Phase 2D of the Bruce Freeman Rail Trail continues to progress forward. Preliminary vegetation clearing and invasive species removal has been mostly completed in the southern portion of the corridor from its intersection with Haynes Road down to the Station Road area. Rail removal will commence during the week of February 13, 2023. This work will start in the area where the corridor intersects with Hudson Road and head northward. Rails will be cut and removed in sections, and immediately followed by the installation of erosion control measures to allow additional vegetation and tie removal, and grading to get underway. Additionally, Town staff is working to coordinate with MassDOT on a groundbreaking event for the project, likely in late March of 2023.<\/p>\n<p><strong>January 31, 2023 Update:<\/strong><\/p>\n<p><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-Hudson-Road-230131.pdf?version=f825894b95296b62a273d495712ad248\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of January 31, 2023.<\/p>\n<p><strong>January 23, 2023 Update:<\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Phase-2D-Bruce-Freeman-Rail-Trail-Photos-Diamond-Station-Road-230123.pdf?version=ef9cbfb9c0e878a51eb0e73f77b8cf6b\"><span style=\"text-decoration: underline\">Photos<\/span><\/a> of Phase 2D Bruce Freeman Rail Trail construction work during the week of January 23, 2023.<\/p>\n<p><strong>January 20, 2023 Update:<\/strong><\/p>\n<p>We are happy to announce that on Monday, January 23, 2023, A.A. Will Corporation and their subcontractor, Stanley Tree Service, will commence active vegetation clearing in the Bruce Freeman Rail Trail Phase 2D corridor. This activity will be the actual start of construction in the field for this rail trail project.<\/p>\n<p>The initial work will commence at the southern end of the Bruce Freeman Rail Trail Phase 2D corridor near Station Road and travel northward. The early stages of this work will include vegetation clearing, including invasive species removal, and chipping within the project\u2019s limit of work in the corridor. This activity will be followed by the installation of erosion control measures, and then the removal of rails and ties in the coming weeks. Grading of the limits of work will begin afterward. <a id=\"FANDOREPORTS\"><\/a><\/p>\n<p><strong>Field Inspection Reports:<\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-19-240719.pdf?version=35fd4b7af17519472059ff295b2c32dc\"><span style=\"text-decoration: underline\">Field Inspection Report #19, July 19, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-18-240621.pdf?version=579d6607eefe200fb319e4b25e2252a9\"><span style=\"text-decoration: underline\">Field Inspection Report #18, June 21, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-17-240514.pdf?version=9921a338c633e47cef58a12d08ee8cc1\"><span style=\"text-decoration: underline\">Field Inspection Report #17, May 14, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-16-240410.pdf?version=25de8dfb7656597e0a2c8709104340c6\"><span style=\"text-decoration: underline\">Field Inspection Report #16, April 10, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-15-240311.pdf?version=e96a74936fd1a7574bf78be5069df993\"><span style=\"text-decoration: underline\">Field Inspection Report #15, March 11, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-14-240206.pdf?version=19f4eaf8a61da4332b614e8c7caafe5b\"><span style=\"text-decoration: underline\">Field Inspection Report #14, February 6, 2024<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-13-231222.pdf?version=72d227ae59e71dc79ba8921108204561\"><span style=\"text-decoration: underline\">Field Inspection Report #13, December 22, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-12-231122.pdf?version=e56286c8af3f5a6fc2ba8574c22ace7d\"><span style=\"text-decoration: underline\">Field Inspection Report #12, November 22, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-11-231012.pdf?version=c44fb3c95555995edf742d98d1cd8857\"><span style=\"text-decoration: underline\">Field Inspection Report #11, October 12, 2023<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-10-230912.pdf?version=6b8d2e67b741d88b44d270f965730aaf\">Field Inspection Report #10, September 12, 2023<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-9-230823.pdf?version=256a3c7c5a9a0d39e3a941e5d0546ce3\">Field Inspection Report #9, August 23, 2023<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-8-230721.pdf?version=d8dcf7587d047b0c06613ab19ab73639\">Field Inspection Report #8, July 21, 2023<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-7-230711.pdf?version=81b4c73d66a7585bf8d69bb494a291ec\">Field Inspection Report #7, July 11, 2023<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-6-230622.pdf?version=df24ba091e98a5b13165cb043187df3e\">Field Inspection Report #6, June 22, 2023<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2023\/05\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-5-230518-1.pdf?version=e07bd90629a741172c3a7dd441a61b67\">Field Inspection Report #5, May 18, 2023<\/a><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Inspection-4-230419.pdf?version=b3e0daf0ad3108cdf230ce47c1237539\"><span style=\"text-decoration: underline\">Field Inspection Report #4, April 19, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Fuss-ONeill-Bruce-Freeman-Rail-Trail-Field-Visit-3-230331.pdf?version=02d1f6804d7fb5149d21554279414cc6\"><span style=\"text-decoration: underline\">Field Inspection Report #3, March 31, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Bruce-Freeman-Rail-Trail-Field-Visit-2-230216.pdf?version=31417d418d9f3576dfccd57ff3f48e15\"><span style=\"text-decoration: underline\">Field Inspection Report #2, February 16, 2023<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Bruce-Freeman-Rail-Trail-Field-Visit-1-230118.pdf?version=73478661c81ec878e8344dd97c251a01\"><span style=\"text-decoration: underline\">Field Inspection Report #1, January 18, 2023<\/span><\/a><\/p>\n<p><strong>November 30, 2022 Update:&nbsp;<br \/>\n<\/strong><\/p>\n<ul>\n<li>The submission deadline for construction bids to MassDOT for the project was on September 7, 2022 and A.A. Will Corporation was selected to be the contractor in late October of 2022.<\/li>\n<li>The first pre-construction meeting for the project was held with MassDOT on November 9, 2022.<\/li>\n<li>A.A. Will Corporation is working to fulfill pre-construction permitting conditions with the Conservation Office before they can begin clearing vegetation (the first step in the project).<\/li>\n<li>A.A. Will Corporation has indicated they would like to conduct the initial vegetation clearing during the 2022-2023 winter, but they may not be able to start until late December or into January of 2023.<\/li>\n<li>More information as to where the initial work will start will be available once the contractor gets closer to actual field work and formulates a plan.<\/li>\n<li>A groundbreaking ceremony for the project will be scheduled sometime in the early spring of 2023.<\/li>\n<\/ul>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-2991\" src=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22.png?version=5236a504b2ce64cdd1e86c814783e994\" alt=\"Bruce Freeman Rail Trail Information Board\" width=\"456\" height=\"1140\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22.png 800w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22-120x300.png 120w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22-410x1024.png 410w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22-768x1920.png 768w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic-7.20.22-614x1536.png 614w\" sizes=\"(max-width: 456px) 100vw, 456px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>June 28, 2022 Update<\/strong>: Town of Sudbury was awarded a $240,000 Mass Trails Grant for Bruce Freeman Rail Trail Extension: Development and Design to CSX Corridor.<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/06\/2022-MassTrails-Grant-Awards.pdf?version=5222d4b3edecdbdb5ec696e86e1b631d\"><span style=\"text-decoration: underline\">2022 MassTrails Grant Awards<\/span><\/a><\/p>\n<p><strong>April 27, 2022 Update<\/strong>:&nbsp; The BFRT, Phase 2D Project has advanced to the final design stages and construction could begin as early as Fall 2022.&nbsp; A few final reviews from Federal partners are underway and Town Meeting approval of Articles 19, 20, and 47 are needed to help reach the finish line.&nbsp; Votes on the Town Meeting articles will give authority to the Select Board to act on behalf of the Town to finalize the right of way process and fund required consultant services, accessory items, and emergency contingency funds for the construction phase. Please visit the&nbsp;<a href=\"https:\/\/sudbury.ma.us\/townmeeting\/tmarticles\/?twn_mtng=TM-2022\">Town Meeting Articles<\/a>&nbsp;page.<\/p>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-full wp-image-2981\" src=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Web-Update-BFRT-220429.png?version=f8f266b00d5f79c48f11443d0dd15521\" alt=\"Bruce Freeman Rail Trail: Phase 2D Design Project Schedule\" width=\"930\" height=\"764\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Web-Update-BFRT-220429.png 930w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Web-Update-BFRT-220429-300x246.png 300w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Web-Update-BFRT-220429-768x631.png 768w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/Web-Update-BFRT-220429-365x300.png 365w\" sizes=\"(max-width: 930px) 100vw, 930px\" \/>4\/21\/22 Update:&nbsp; <\/strong>The Sudbury <a href=\"https:\/\/sudbury.ma.us\/townmeeting\/wp-content\/uploads\/sites\/358\/2022\/04\/Sudbury-2022-May-Annual-Town-Meeting-Warrant.pdf?version=d267836092aa0eb1d9bdc51971597134\"><u>Annual Town Meeting<\/u><\/a> is May 2nd (potentially to be continued to May 3rd and 4th) and will involve four BFRT related articles. Articles 19, 20, and 47 must be approved at Town Meeting to allow the 4.4-mile, Phase 2D section (Concord Town Line to Mass Central Rail Trail) of the BFRT to advance to the construction phase.&nbsp; The BFRT-related articles are:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<ul>\n<li>Article 19. Bruce Freeman Rail Trail Phase 2D \u2013 Acquisition of Land (Corridor Lease and Temporary Easements)<\/li>\n<li>Article 20. Bruce Freeman Rail Trail Phase 2D \u2013 Grant of Easements<\/li>\n<li>Article 47. Community Preservation Act Fund \u2013 Bruce Freeman Rail Trail Design and Construction North of Mass Central Rail Trail<\/li>\n<li>Article 48. Community Preservation Act Fund \u2013 Bruce Freeman Rail Trail Design and Construction South of Mass Central Rail Trail<\/li>\n<\/ul>\n<p>Reference Plans:&nbsp; Plans referenced in Articles 19 and 20 are <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT_Final-ROW-Plans_1-18-2022.pdf?version=1802995edec5d9e05ba3cbf81db85211\"><span style=\"text-decoration: underline\">\u201cMassachusetts Department of Transportation Highway Division Plan and Profile of Bruce Freeman Rail Trail in the Town of Sudbury Middlesex County Final Right of Way Submission\u201d dated January 18, 2022 prepared by Fuss &amp; O\u2019Neill.<\/span>&nbsp;<\/a><\/p>\n<p>The project is on track for design completion in June of 2022 and construction contract advertising later in 2022.<\/p>\n<p><strong>1\/31\/22 Update<\/strong>: The following milestones have been recently achieved and the project is on track for design completion in June of 2022 and construction contract advertising later in 2022.<\/p>\n<ul>\n<li>The <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/001_608164_Sudbury_BFRT_100-HWY-XSECT.pdf?version=65f026feda0e61169d2a7142cea29acb\"><span style=\"text-decoration: underline\">100% design<\/span><\/a> plans and associated materials were submitted to MassDOT on January 18, 2022.&nbsp;<\/li>\n<li>The NOI was submitted to the Conservation Commission and the hearing opened on <a href=\"https:\/\/sudbury.ma.us\/conservationcommission\/608164_bfrt_noi_100pct_complete\/\"><u>December 10, 2021<\/u><\/a> and will be continued on February 7, 2022. The application documents may be found on the associated Conservation Commission Meeting Pages, in Supporting Materials.<\/li>\n<li>The Comment Period for the Section 4(f) review was announced. &nbsp;This process involves the review of proposed uses of Town-owned property for associated BFRT purposes, &nbsp;since construction of the project is funded by FHWA and MassDOT.&nbsp; The <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/Sudbury-BFRT-4f-Legal-Ad-Notice-for-MW-Daily.pdf?version=34d022e6d340c5b4a81840fd862bd8d0\"><u>public notice<\/u><\/a> and <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/4f-Primer-Town-Outreach.pdf?version=9ca0f11b8764bce48a7a3685c851b204\"><u>background information<\/u><\/a> are found below.<\/li>\n<\/ul>\n<p><strong>12\/22\/21 Update<\/strong>: The Secretary of Energy and Environmental Affairs issued the <a href=\"https:\/\/sudbury.ma.us\/pcd\/2021\/11\/22\/bruce-freeman-rail-trail-environmental-notification-form-filed\/certificate-16482-enf-bfrt-12-22-21\/\">MEPA Certificate<\/a> and determined the ENF has adequately described and analyzed the project and its alternatives, and assessed its potential environmental impacts and mitigation measures. Based on review of the ENF and comments received on it, and in consultation with State Agencies, it was determined that an Environmental Impact Report (EIR) is not required.&nbsp;&nbsp;<\/p>\n<p><strong>11\/22\/21 Update<\/strong>: MassDOT and the Town of Sudbury have submitted the Environmental Notification Form (ENF) for the Bruce Freeman Rail Trail Project to the Massachusetts Environmental Protection Agency (MEPA). See details at <a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=2890\" target=\"_blank\" rel=\"noopener\" data-link-type=\"web\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail ENF Filing info<\/span>.<\/a> <a id=\"PROJECTPLANS\"><\/a><\/p>\n<p><strong>Project Plans:<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><strong><em>Bruce Freeman Rail Trail &#8211; Phase 3<\/em><\/strong><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Bruce-Freeman-Rail-Trail-Phase-3-Submitted-75-Design-Plans.pdf?version=0eef7bbd2b6d19881854c91e27e8b2b0\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail &#8211; Phase 3 Submitted 75% Design Plans<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/Bruce-Freeman-Rail-Trail-Phase-3-Final-25-Design-Plans.pdf?version=98c6d43fcce8b004c2a161659b5e09d4\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail &#8211; Phase 3 Submitted 25% Design Plans<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2024\/02\/BFRT-Phase-3-Preliminary-25-design.pdf?version=018f30a4efbf81b9a8f46e312fd3c8c0\">Bruce Freeman Rail Trail &#8211; Phase 3 Preliminary 25% Design Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><strong><em>Bruce Freeman Rail Trail &#8211; Phase 2D&nbsp;<\/em><\/strong><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Conformed-Plan-Set-220901.pdf?version=0ea5f196e0a346dc288d43936374b7f8\">Bruce Freeman Rail Trail Conformed Plan Set, September 1, 2022<\/a><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Final-Right-of-Way-Plans-220526.pdf?version=da55c43e4cab54959084118c98df5f22\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail Final Right of Way Plans, May 26, 2022<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Notice-of-Intent-211222.pdf?version=62d9cb8c358c22d34164cf1b50fff34a\">Bruce Freeman Rail Trail Notice of Intent, December 22, 2021<\/a><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Order-of-Conditions-220301.pdf?version=5aaf7f2108e470308cf94659dc14fd6f\"><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail Order of Conditions, March 1, 2022<\/span><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2020\/11\/BFRT-Infographic_hiresv3.png?version=94c5352358cbe45108f70fc791bc4231\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft wp-image-2995 size-medium\" src=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic_archive-thumb-288x300.jpg\" alt=\"10\/15\/21 Update\" width=\"288\" height=\"300\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic_archive-thumb-288x300.jpg 288w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic_archive-thumb-768x799.jpg 768w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2022\/04\/BFRT-Infographic_archive-thumb.jpg 800w\" sizes=\"(max-width: 288px) 100vw, 288px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline\">Bruce Freeman Rail Trail Advisory Task Force<\/span><br \/>\nPlease see the <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/bfrt\/\">BFRT Advisory Task Force<\/a><\/span> webpage for information on the Task Force.<\/p>\n<p><span style=\"text-decoration: underline\">Email Notification<\/span><strong><br \/>\n<\/strong>If you are interested in receiving project updates about the Sudbury BFRT, please sign up for <a href=\"https:\/\/sudbury.ma.us\/email-lists\/bfrt\/\"><span style=\"text-decoration: underline\">email notification.<\/span>&nbsp;<\/a><\/p>\n<h2><strong>Design Schedule and Updates<\/strong><\/h2>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/008_608164_Sudbury-BFRT_100-Schedule_1-18-2022.pdf?version=9bfec49bb0d11e5d4821fc4cc21a8992\"><span style=\"text-decoration: underline\">Project Schedule<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/bfrt-update-select-board-memo-12-3-21\/\">Latest Select Board Project Management Report<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/bfrt-sb-project-status-update-21-12-03\/\">KPI Update<\/a><br \/>\n<\/span><strong>Fuss &amp; O&#8217;Neill, Design Consultant Monthly Reports<\/strong><br \/>\nMonthly Reports 2021:&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-january-2021\/\">January<\/a><\/span> &nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-february-2021\/\"><span style=\"text-decoration: underline\">February<\/span> <\/a>&nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-march-2021\/\">March<\/a><\/span> &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-april-2021\/\">April<\/a><\/span>&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-may-2021\/\">May<\/a><\/span>&nbsp; <a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-june-2021-2\/\"><span style=\"text-decoration: underline\">June<\/span><\/a>&nbsp; <a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-july-2021\/\"><span style=\"text-decoration: underline\">July<\/span><\/a>&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-august-2021\/\">August<\/a><\/span>&nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-september-2021\/\"><span style=\"text-decoration: underline\"> September<\/span><\/a>&nbsp; &nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-october-2021\/\"><span style=\"text-decoration: underline\">October<\/span><\/a>&nbsp; <a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-november-2021\/\"><span style=\"text-decoration: underline\">November<\/span><\/a><\/p>\n<p>Monthly Reports 2020: <a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/fuss-oneill-report-november-2020\/\"><span style=\"text-decoration: underline\">November<\/span><\/a>&nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/fuss-oneill-report-december-2020\/\"><span style=\"text-decoration: underline\">December<\/span><\/a><\/p>\n<h3><strong>100% Design Submission, January 18, 2022<\/strong><\/h3>\n<p><a href=\"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2020\/11\/001_608164_Sudbury_BFRT_100-HWY-XSECT.pdf?version=65f026feda0e61169d2a7142cea29acb\"><span style=\"text-decoration: underline\">100% Plans<\/span><\/a><\/p>\n<h3><strong>75% Design Submission, May 12, 2021<\/strong><\/h3>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/608164_Sudbury_BFRT_75_Plan_1webpg.pdf?version=3d180a905c085994e6f2ca14a3306c40\"><span style=\"text-decoration: underline\">75% Plan Set &#8211; First part<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/608164_sudbury_bfrt_75_plans_2webpg\/\">75% Plan Set &#8211; Second part<\/a><\/span><\/p>\n<h3><strong>Preliminary Concepts for 75% Design<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/BFRT-ATF-SB-Joint-Meeting-2021-03-16-Recommendations.pdf?version=795f784c588fef68902f9e25b7a9587a\"><u>Presentation to the Select Board of the BFRT Advisory Task Force 75% Design Recommendations, March 16, 2021 \u2013 Board Approved Concepts and Recommendations<\/u><\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/freeman-rail-trail-task-force-meeting-presentation-2021-03-09\/\">Presentation to the BFRT Advisory Task Force, March 9, 2021<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/bfrt-tf-meeting-presentation-2021-02-23-to-post-to-web\/\">Presentation to the BFRT Advisory Task Force, February 23, 2021<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/prelim-concept-broadacres-morse-road-parking-lot\/\">Preliminary Concept 1 Broadacres Farm Parking, Connection, and Amenities<\/a><br \/>\n<\/span><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/broadacres-morse-road-parking-lot-opt2\/\"><span style=\"text-decoration: underline\">Preliminary Concept 2 Broadacres Farm Parking, Connection, and Amenities<\/span><\/a><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/prelim-draft-davis-and-parkinson-connections\/\">Draft Plan North Road, Davis Field &amp; Hudson Road, Parkinsons Field Connections<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/prelim-draft-hudson-peakham-intersection-feb-2021\/\">Draft Signalized Intersection Plan Hudson and Peakham Roads<\/a><\/span><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/2021-02-01-pavement-markings-and-signing-plansnl\/\"><span style=\"text-decoration: underline\">Draft Concept Wayfinding and Pavement Markings<\/span><\/a><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/rotary-set-extracted-from-eversource-revised-dcr-sw-plans-210113\/\">Proposed Intersection Mass Central Rail Trail (Extracted from DCR Permit Plans)<\/a><\/span><\/p>\n<h3><strong><br \/>\nSection 4(f) Information<\/strong><\/h3>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/Sudbury-BFRT-4f-Legal-Ad-Notice-for-MW-Daily.pdf?version=34d022e6d340c5b4a81840fd862bd8d0\"><span style=\"text-decoration: underline\">Public Notice Section 4(f) Comment Period<\/span><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/11\/4f-Primer-Town-Outreach.pdf?version=9ca0f11b8764bce48a7a3685c851b204\"><span style=\"text-decoration: underline\">Town-owned parcel summary of uses and background information<\/span><\/a><\/p>\n<h3><strong>Town of Sudbury Acquires CSX Corridor to Advance Open Space and Trail Connectivity Goals<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\">December 17, 2020<\/span>: The Town of Sudbury has closed on a deal to acquire the 1.4-mile CSX rail corridor in south Sudbury, ensuring the Town\u2019s control of the corridor use and the possible expansion of the regional Bruce Freeman Rail Trail (BFRT) system.<\/p>\n<p>For more details, please see the <a href=\"https:\/\/sudbury.ma.us\/townmanager\/?p=1852\"><span style=\"text-decoration: underline\">CSX Corridor Acquisition Press Release<\/span><\/a>.<\/p>\n<h3><strong>Survey Activity in the Bruce Freeman Rail Trail Corridor<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\">November 23, 2020<\/span>: Over the course of the next couple weeks, residents may notice survey crews walking the Bruce Freeman Rail Trail (BFRT) corridor, gathering supplemental information for the right of way and wetlands. The corridor runs from the Concord Town line to Station Road off of Union Avenue. Survey work will also be conducted near the rail corridor on Broadacres Farm at 82 Morse Road. The crew members are affiliated with Fuss &amp; O\u2019Neill, who has been contracted by the Town to complete the final BFRT design, and their survey subconsultants at GCG Associates.<\/p>\n<p>We ask that residents do not remove any flags or markers placed in the wetlands or within corridor along property lines so that all data can be collected.<\/p>\n<p>If you have any questions or concerns please do not hesitate to contact the Planning and Community Development office at 978\u2010639\u20103387 or email <a href=\"mailto:pcd@sudbury.ma.us\">pcd@sudbury.ma.us<\/a>.<\/p>\n<h3><strong><br \/>\nFuss &amp; O&#8217;Neill onboard as Design&nbsp;Consultant for the the Bruce Freeman Rail Trail Project<\/strong><\/h3>\n<p>Fuss &amp; O\u2019Neill (F&amp;O) was selected as the design engineering consultant to complete the final design of the BFRT from the Concord Town line to Station Road off Union Avenue.&nbsp; The Board of Selectmen approved the contract on November 4, 2020 and the contract notice to proceed was issued on November 6. Fuss &amp; O\u2019Neill will complete the final design and permitting of the BFRT, Phase 2D, from the Concord Town line to Station Road off Union Avenue. The final design will expand on the 25% designed finalized by VHB and Jacobs in 2019. The project includes final design for the path, bridges of Hop and Pantry Brooks, parking, connector paths, landscaping, environmental permitting and mitigation, and numerous opportunities for public engagement. The Fuss &amp; O\u2019Neill team will work closely with the Town and MassDOT to complete the trail design and permitting process which will conclude with a MassDOT construction contract in 2022. The final design of the half mile section of the BFRT in Concord south of Powder Mill Road will also be incorporated into the construction contract.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Town Reaches Agreement with CSX on Acquisition of CSX Corridor<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\">November 24, 2020<\/span>:&nbsp;&nbsp;The November 3, 2020, <a href=\"https:\/\/sudbury.ma.us\/clerk\/?p=2719\">Presidential\/State Election<\/a> Ballot Question 3 sought to authorize spending for the land purchase and passed at the election. At the Board of Selectmen\u2019s meeting on November 17, 2020, the results of due diligence were reported, an amendment to the PSA was approved,&nbsp;and the Board voted to advance to closing, which is anticipate to occur the week of November 30, 2020. <a href=\"https:\/\/sudbury.ma.us\/townmanager\/2020\/08\/26\/town-of-sudbury-reaches-agreement-on-csx\/\">Click for more information.<\/a><\/p>\n<p><span style=\"text-decoration: underline\">August 26, 2020<\/span>: Town of Sudbury has reached an agreement and signed a purchase and sale agreement with CSX regarding the acquisition of the CSX-owned 1.4-mile corridor for future potential expansion of the Bruce Freeman Rail Trail.<a href=\"https:\/\/sudbury.ma.us\/townmanager\/2020\/08\/26\/town-of-sudbury-reaches-agreement-on-csx\/\"> Click for more information.<\/a><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>MassTrails Grant Award for Sudbury Acquisition of CSX Corridor<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\">August 1, 2020<\/span>: Town of Sudbury has been awarded a $300,000 MassTrails Grant toward the acquisition of the CSX-owned 1.4-mile corridor for future potential expansion of the Bruce Freeman Rail Trail. Learn more at <a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=2571\">https:\/\/sudbury.ma.us\/pcd\/?p=2571<\/a>. &nbsp;This grant combined with the 2018 Recreational Trails Grant of $100,000 will cover approximately one third of the purchase price.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>MassDOT Design Public Hearing: July 16 &#8211; 30, 2020<\/strong><\/h3>\n<p>MassDOT\u2019s virtual Design Public Hearing for the BFRT in Sudbury was presented as a webinar which was posted online on July 16<sup>th<\/sup>. &nbsp;Public comments to be captured as part of the Design Public Hearing proceedings were directed to MassDOT by July 30<sup>th<\/sup>. The video will be available and additional comments may be submitted on an ongoing basis following compilation of the Public Hearing proceedings.<\/p>\n<p>The hearing is presented at <a href=\"https:\/\/www.mass.gov\/massdot-highway-design-public-hearings\">https:\/\/www.mass.gov\/massdot-highway-design-public-hearings<\/a>&nbsp;and on <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.vod.castus.tv\/vod\/?video=a61ae083-dcc8-4ea2-8be8-2004150bf134&amp;nav=recent\">Sudbury TV<\/a><\/span>.<\/p>\n<p><span style=\"text-decoration: underline\">Design Public Hearing Slides for Reference:<\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/design-public-hearing-608164-bfrt-sudbury-slides-1-9\/\">Slides 1-9<\/a>, Project Introduction, History, Scope<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/design-public-hearing-608164-bfrt-sudbury-slides-10-25\/\">Slides 10-25<\/a>, Design Elements, Roadway Crossings<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/design-public-hearing-608164-bfrt-sudbury-26-37\/\">Slides 26-37<\/a>, Historic Elements, Traffic, Structural Design Introduction<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/design-public-hearing-608164-bfrt-structural-38-52\/\">Slides 38-52<\/a>, Structural Design Hop Brook and Boardwalk<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/design-public-hearing-608164-bfrt-sudbury-slides-53-71\/\">Slides 53-71<\/a>, Structural Design Pantry Brook, Environmental Context, Next Steps, How to Comment<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/dph-transcript_sudbury_7-16-2020_final\/\">Transcript of the Hearing with Public Comments<\/a><\/p>\n<p>Click below to learn more about the hearing:<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=2498\">Public Hearing Announcement<\/a>&nbsp; &nbsp;&nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury-BFRT-VIRTUAL_PUBLIC_HEARING_7.16.20_MEETING_NOTICE.pdf?version=89bf03818ca1d31771ec19445decc757\">Public Hearing Notice<\/a>&nbsp; &nbsp; &nbsp;&nbsp;&nbsp;&nbsp;<a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer.pdf?version=02301368f305cc74c2c6e6dbaf53c5b9\">Public Hearing Flyer<\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer.pdf?version=02301368f305cc74c2c6e6dbaf53c5b9\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-2501\" src=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-231x300.jpg\" alt=\"MassDot highway division notice of a public hearing webinar flyer\" width=\"231\" height=\"300\" srcset=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-231x300.jpg 231w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-787x1024.jpg 787w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-768x999.jpg 768w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-1181x1536.jpg 1181w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-1575x2048.jpg 1575w, https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2020\/06\/Sudbury_BFRT_MassDOT-Webinar_7.16.20_Flyer-scaled.jpg 1968w\" sizes=\"(max-width: 231px) 100vw, 231px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>BFRT MassDOT Approved 25% Design Plans<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/608164-BFRT-25-Submission-Redux.pdf?version=e982ccaba0b3e43cd1c764f74bc56084\">25% Design Path Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/sudbury-s-31-007-approved-sketch-plans-06-26-2020\/\">Hop Brook Bridge Sketch Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/Sudbury-S-31-018-Approved-Sketch-Plans-06.26.2020.pdf?version=fd3168656403f4269a084c6001ec51ce\">Boardwalk Sketch Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/Sudbury-S-31-013-Approved-Sketch-Plans-06.26.2020.pdf?version=1dfdf967f28e55c7d94393b8618c3b91\">Pantry Brook Bridge Sketch Plans<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>MassDOT Comments on 25% Design with Sketch Plans<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/crm_meeting_notes_5-6-20\/\">MassDOT Comments and Comment Resolution &#8211; General<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_rtc-25_percent_row_comments_for_crm_5-13-20\/\"><span style=\"font-size: 1rem\">MassDOT Comments and Comment Resolution &#8211; ROW<\/span><\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/crm-traffic-meeting-notes-6-2-20\/\">MassDOT Comments and Comment Resolution &#8211; Traffic<\/a><br \/>\n<\/span><\/p>\n<p>(Sketch Plan Comments require file transfer due to file sizes)<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>25% Revised Sketch Plan Submission to MassDOT&nbsp;April 2020<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/006_608164_bfrt-25-re-geotech-report\/\">Approved Geotechnical Report<\/a><\/span><\/p>\n<p>Approved Hydraulic Report, Pantry Brook<\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/bfrt-25-re-hydraulic_pantry-brook_report_1\/\">Report<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hydraulic_pantry-brook-app-6-1\/\">Appendix 6.1 FEMA Hydraulic Model<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hyd-_pantry-br-app-6-2\/\">Appendix 6.2 StreamStats&nbsp;<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hyd-_pantry-br-app-6-3-r\/\">Appendix 6.3 FIRM Information<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hyd-_pantry-br-app-6-4\/\">Appendix 6.4 Existing HEC-RADS Model and Results<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; &nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hyd-_pantry-br-app-6-5\/\">Appendix 6.5 Proposed HEC-RADS Model and Results<\/a><\/span><\/p>\n<p>&nbsp; &nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-hyd-_pantry-br-app-6-6-7\/\">Appendix 6.6 and 6.7 Scour Analysis and Rip Rap Calculations<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/004_608164_bfrt-25-re-hydraulic_hop-brook_2020-06-01\/\">Approved<\/a> <a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/004_608164_bfrt-25-re-hydraulic_hop-brook_2020-06-01\/\">Hydraulic Memo, Hop Brook<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/sudbury-s-31-007-approved-sketch-plans-06-26-2020\/\">Hop Brook Bridge Sketch Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/Sudbury-S-31-018-Approved-Sketch-Plans-06.26.2020.pdf?version=fd3168656403f4269a084c6001ec51ce\">Boardwalk Sketch Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/Sudbury-S-31-013-Approved-Sketch-Plans-06.26.2020.pdf?version=1dfdf967f28e55c7d94393b8618c3b91\">Pantry Brook Bridge Sketch Plans<\/a><\/span><\/p>\n<p><strong>Construction Estimates<\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-25-bfrt-estimate\/\">Path<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/007_608164_bfrt-25-estimate_pantry-brook\/\">Pantry Brook Bridge<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/007_608164_bfrt-25-estimate_hop-brook\/\">Hop Brook Bridge<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/sudbury_bfrt_sketch_plan_memo-and-estimate_rev1_05_15_2020\/\">Boardwalk<\/a><\/span><\/p>\n<h3><strong><br \/>\nBFRT Project Update February 2020<\/strong><\/h3>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Sudbury-MPO-TIP-Readiness-Comment-2020.pdf?version=a041c79413cc52996b9b950811bbb636\"><span style=\"text-decoration: underline\">Boston Metropolitan Planning Organization (MPO) Matt Genova Email Update on Transportation Improvement Program (TIP) Planning\/Project Readiness<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/massdot_bfrt_pollack_2_18_20\/\">Select Board Letter to MassDOT, February 12, 2020<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>BFRT Project Update December 9, 2019<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Status-with-PDDG-Figure-2-8.pdf?version=153beddee7675b68e48a11ea3e0e1352\">MassD<\/a><a style=\"background-color: #ffffff;font-size: 1rem\" href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Status-with-PDDG-Figure-2-8.pdf?version=153beddee7675b68e48a11ea3e0e1352\">OT General Design Process Flowchart (BFRT &#8211; Sudbury Design Status highlighted)<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/bfrt-sketch-plans-schedule_rev6-11_20_19\/\">Schedule for 25% Design and Design Public Hearing<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>25% Sketch Plan Submission to MassDOT November 27, 2019<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-geotech-report\/\">Geotechnical Report<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/608164_BFRT-Hydraulic-Report.pdf?version=b11b637c1731f34598eb49d89e6aaa95\">Hydraulic Report<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-sketch-plans-s-31-013-pantry\/\">Sketch Plan Pantry Brook Bridge<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-sketch-plans-s-31-007-hop\/\">Sketch Plan Hop Brook Bridge<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164_bfrt-sketch-plans-s-31-xxx-boardwalk\/\">Sketch Plan Boardwalk (south of Hudson Road)<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Soil Samples\/Borings along the Corridor in Summer 2019<\/strong><\/h3>\n<p><u><span style=\"color: #0066cc\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2019\/08\/01\/crews-collecting-data-on-the-bruce-freeman-rail-trail-corridor\/\">Crews collecting data on the Bruce Freeman Rail Trail Corridor, August 2019 Public Notice<\/a> <\/span><\/u><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>BFRT Project Update July 9, 2019<\/strong><\/h3>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/bos-memo-7-9-19\/\">Memo for BOS Meeting July 9, 2019<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><strong>25% Structural Design (Bridge Sketch Plans) Development<br \/>\n<\/strong><\/span><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/bfrt-sketch-plans-schedule_3_19\/\">Schedule March 2019<\/a><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><strong><br \/>\nMassDOT Comments Received on 25% Submission <span style=\"color: #000000\">(Without Sketch Plans)<\/span><br \/>\n<\/strong><\/span><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/Bridge-Section-Comments-Pantry-Brook.pdf?version=e5ef465fb2d66028195ca3429dd91237\">Bridge Section Comments Pantry Brook<br \/>\n<\/a><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/Bridge-Section-Comments-Hop-Brook.pdf?version=1a47da8900587eb53987755e5c802dbf\"><span style=\"text-decoration: underline\">Bridge Section Comments Hop Brook&nbsp;<\/span><br \/>\n<\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/Geotechnical-Section-Comments.pdf?version=8c5d4536f68c1688dc14c606eb1522e4\">Geotechnical Section Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-c-r-25-landscaping-review-2-7-2018\/\">Landscape Section Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-c-r-form-25-env\/\">Environmental Section Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/sudbury-bfrt-25-bos-traffic-20171228\/\">Traffic (Boston) Section Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-sudbury-bike-path-cs-review-25-20180126\/\">Complete Streets Section Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-sudbury-bfrt-25-row-review-sent-to-pm\/\">ROW Section Preliminary Comments<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/608164-sudbury-utilities-national-grid-gas-20180102\/\">Utilities Section Comments<\/a><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>25% Design Plans (Without Sketch Plans)<br \/>\n<\/strong><\/span><\/span>Town Letters to MassDOT:&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1819\">September 8, 2017<\/a><\/span>&nbsp;and&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1813\">September 15, 2017<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/608164-BFRT-25-Submission-Redux.pdf?version=e982ccaba0b3e43cd1c764f74bc56084\">25% Design Plan Set<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/25-Submission-Booklet-Redux.pdf?version=96eed90872b34839fd673b40bd465990\">25% Design Submission Booklet (Highway, Environmental, and Traffic Checklists, Construction Cost Estimate, and Parking Memo)<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1815\">Functional Design Report<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/HopBrook-Prelim-Structures-Report-Redux.pdf?version=89b476730f38a0d1d0de2a0dd3e8c56c\"><span style=\"color: #0066cc;text-decoration: underline\">Hop Brook Preliminary Structures Report&nbsp;<br \/>\n<\/span><\/a><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Type-Study-Report-Sudbury-BFRT-over-Pantry-Brook-For-Printing.pdf?version=91eb1095a1e3d1384d7fc63f5916f8ab\">Pantry Brook Bridge Type Study Report<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?attachment_id=1814\">25% Design&nbsp;Right of Way (ROW)&nbsp;Plans<\/a><\/span><br \/>\n<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/608164-BFRT-25-Color-Utility-Submission-Opti.pdf?version=331de4432a3d2ba6a8c53650a9e3d66f\">25% Design Utility Plans<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/273\/2020\/04\/ConservationCommission_2020_Apr_13_supporting_materials_2.pdf?version=3db9847201a1726a7a810b75318edfae\">General Wildlife Habitat Assessment Report Bruce Freeman Rail Trail Sudbury, Massachusetts, Wildlife Habitat Assessment Relative to the 25% Design Submittal dated November 2016<\/a><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/bfrt-culvert-inventory-updated-tighe-bond\/\"><span style=\"text-decoration: underline\">Culvert Inventory<\/span><\/a><br \/>\n<span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong><br \/>\nOther Documents, September 2017<br \/>\n<\/strong><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Final-Response-to-25Town-Comments.pdf?version=6c3d83d2402496ce098a35654da305b7\">Designer (VHB) Response to Town Comments<\/a>&nbsp;<\/span><br \/>\n<span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"> <a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/WetlandImpacts9.25.17.pdf?version=2e0e9d8d1afab8c120634724b4d5b861\"><span style=\"text-decoration: underline\">Estimated Wetlands Impacts<\/span><br \/>\n<\/a><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/09\/Floodplain-Impacts-9.25.17.pdf?version=2e0e9d8d1afab8c120634724b4d5b861\">Estimated Floodplain Impacts<\/a><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n&nbsp;<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"text-align: left\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>Preliminary Design Plans<\/strong><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000;text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1513\">Preliminary Design Memo from VHB<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1520\"><span style=\"font-size: 10pt\">Preliminary Design Plans Overview<\/span>&nbsp;Presentation Identifying Some&nbsp;Challenge Areas<\/a><br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000;text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1517\">Preliminary Design Plans<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1519\">Preliminary Profiles<\/a><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1518\">Preliminary Cross Sections<br \/>\n<\/a><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2014\/11\/Preliminary-Roadway-Crossing-Plans-Feb-2017.pdf?version=8d823876e2d8072925b38c292365a205\">Preliminary Roadway Crossing Plans Feb 2017<\/a><\/span><\/span><\/span><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/parking-memo-no-broadacres\/\"><span style=\"text-decoration: underline\">Existing Conditions Parking Memo<\/span><\/a><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/FInal-BFRT-Task-Force-Recommendations.pdf?version=28fe93927ca11c3a7172c2da5e5a8dff\">Final BFRT Design Task Force Recommendations March 2017<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><strong style=\"color: #000000;font-family: Arial, sans-serif;font-size: 13.3333px;text-decoration: underline\">Alternatives Analysis<\/strong><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2014\/11\/25\/bruce-freeman-rail-trail-update-info\/figure1_alternatives_ev_11x17\/\">Potential Roadway Alternative Routes <\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><strong>Design Process<br \/>\n<\/strong><\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/proposal-request\/\"><u><span style=\"color: #0563c1\">Proposal Request \u2013 25% Design BFRT<\/span><\/u><\/a><span style=\"color: #000000\">; September 10, 2014<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/vhb-final-proposal-combined\/\"><u><span style=\"color: #0563c1\">Accepted Proposal Response &#8211; VHB<\/span><\/u><\/a><span style=\"color: #000000\">; October 3, 2014<\/span><\/span><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&nbsp;<\/span><\/span><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT_RFP_Final_with_Scope-PDF.pdf?version=1414f6f3cacb03ce72aabde3c01385ea\"><span style=\"text-decoration: underline\">BFRT Final Design Proposal Request;<\/span> <\/a>August 31, 2020<\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2017\/10\/BFRT-Fuss-ONeill-Technical-Proposal_9-25-20-Reduced-1.pdf?version=146604a6c6d247accb036606e7f13ec2\"><span style=\"text-decoration: underline\">Design Proposal &#8211; Fuss &amp; O\u2019Neill;<\/span><\/a> September 23, 2020<\/p>\n<p><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">Communications\/Correspondence<br \/>\n<\/span><\/span><\/strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1522\">October Update Memo &#8211; BOS Meeting<\/a><\/span>; November 1, 2016<\/span><\/span><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n<\/span><\/span><\/strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1375\">August Update Memo &#8211; VHB<\/a><\/span>; August 31, 2016<\/span><\/span><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><br \/>\n<\/span><\/span><\/strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2014\/11\/25\/bruce-freeman-rail-trail-update-info\/post-dep-soc_-abrams-et-al-v-sudbury-conservation-commission-et-al\/\"><u><span style=\"color: #0563c1\">Town Counsel Opinion on Superseding Order of Conditions<\/span><\/u><\/a><span style=\"color: #000000\">; August 7, 2015<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1350\"><u><span style=\"color: #0563c1\">MassDOT Letter May 5, 2015<\/span><\/u><\/a><span style=\"color: #000000\">;<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=350\"><u><span style=\"color: #0563c1\">MassDOT Letter May 1, 2014<\/span><\/u><\/a><span style=\"color: #000000\">;<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">&nbsp;<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\">BFRT Meetings<br \/>\n<\/span><\/span><\/strong><span style=\"color: #000000\"><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"color: #000000\"><span style=\"font-size: 10pt\">Bruce Freeman Rail Trail Meeting; March 9, 2017 <\/span><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/02\/16\/bruce-freeman-rail-trail-public-meeting\/\"><u><span style=\"color: #0066cc;font-size: 10pt\">Meeting Flier<\/span><\/u><\/a><\/span><\/span>&nbsp; <a href=\"https:\/\/sudbury.ma.us\/pcd\/2017-03-09-meeting-notes\/\"><span style=\"text-decoration: underline\">March 9, 2017 meeting Notes<\/span><\/a><br \/>\n<\/span><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1138\">Bruce Freeman Rail Trail Meeting November 29, 2016<\/a><\/span>&nbsp;&nbsp;&nbsp;<br \/>\n<a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1072\"><u><span style=\"color: #0563c1\">Bruce Freeman Rail Trail Design Charrette<\/span><\/u><\/a><span style=\"color: #000000\">; August 25, 2016<span style=\"font-size: 10pt\">&nbsp;&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1524\">August 25, 2016 Meeting Notes<\/a><\/span><\/span><br \/>\n<\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/selectboardsoffice\/?p=1020\"><u><span style=\"color: #0563c1\">Bruce Freeman Rail Trail Meeting June 21, 2016<\/span><\/u><\/a><span style=\"color: #000000\">; &nbsp;&nbsp;<span style=\"font-size: 10pt\">&nbsp;<span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=1523\">Presentation<\/a>&nbsp;<\/span><\/span><br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2014\/12\/Forum-Flyer.pdf\"><u><span style=\"color: #0563c1\">Rails to Trails Public Forum<\/span><\/u><\/a><span style=\"color: #000000\">; January 22, 2015&nbsp; <\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/wp-content\/uploads\/sites\/326\/2015\/02\/Sudbury-Rails-to-Trails-Forum_Minutes-doc.pdf\"><u><span style=\"color: #0563c1\">Rails to Trails Forum Minutes<\/span><\/u><\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><strong>Other Items<\/strong><\/span><\/p>\n<p>Support letters from BFRT Town Representatives:&nbsp; <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/gardner-support-letter-bfrt-nolinks\/\">Acton<\/a>,<\/span> <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/wojtas_letter_to_sudbury_bos\/\">Chelmsford<\/a>,<\/span> <span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/almeida-support-for-rail-trail-in-sudbury-nolinks\/\">Westford<\/a><\/span><\/p>\n<p><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><span style=\"text-decoration: underline\"><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/326\/2017\/10\/Proposal-for-Rec-Trails-Grant-2018-FINAL-searchable.pdf?version=5979e1d3aaefad1b29d2ab910857eaa9\">Request for Funding to Acquire the Northern Portion of the CSX Corridor &#8211; 2018 Application&nbsp;for the Recreational Trails Program Grant<\/a><\/span><br \/>\n<a href=\"https:\/\/sudbury.ma.us\/pcd\/?p=351\"><u><span style=\"color: #0563c1\">Town Meeting CPC Appropriation Vote<\/span><\/u><\/a><span style=\"color: #000000\">; May 7, 2014<br \/>\n<\/span><\/span><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\"><a href=\"https:\/\/sudbury.ma.us\/selectboard\/selectboard-2014-04-08-minutes\/\"><u><span style=\"color: #0563c1\">Board of Selectmen BFRT Gift Acceptance Vote<\/span><\/u><\/a>; April 8, 2014 (begins on page 5)<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2017\/10\/01\/bruce-freeman-rail-trail-update-info\/val-maps-sta-211-528-combined\/\">Railroad Valuation Maps<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/confirmatory-taking-acton-concord-sudbury-bruce_freeman_order_of_taking_8-20-14-20-14\/\">MassDOT Confirmatory Taking (Acton, Concord, Sudbury)<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong><span style=\"font-family: 'Arial',sans-serif;font-size: 10pt\">Rail Trail Resources<\/span><\/strong><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/www.mass.gov\/doc\/2006-project-development-and-design-guide\/download\">MassDOT Project Development and Design Guide<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/www.mass.gov\/guides\/shared-use-path-planning-and-design-guide\">Shared Use Path Planning and Design Guide<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/sudbury.ma.us\/pcd\/2020\/11\/24\/bruce-freeman-rail-trail-update-info\/masstrails_sup-impacts_report-2021\/\">Impacts of Shared Use Paths: &nbsp;A study of the economic, health, transportation, environmental, safety, and accessibility impacts of four shared use paths in Massachusetts<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/www.ctps.org\/tip\">Boston Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP)<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a style=\"font-size: 1rem\" href=\"https:\/\/www.mass.gov\/welcome-to-masstrails\">MassTrails<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a href=\"https:\/\/brucefreemanrailtrail.org\/\">Friends of the Bruce Freeman Rail Trail &#8211; BFRT Trail Maps<\/a><\/span><\/p>\n<p><span style=\"text-decoration: underline\"><a style=\"font-size: 1rem\" href=\"https:\/\/trailmap.mapc.org\/\">Metropolitan Area Planning Council (MAPC) Trailmap (Regional Online Trail Map)<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>USE AT YOUR OWN RISK: The recently constructed portion of the Bruce Freeman Rail Trail in Sudbury is now open for public use but \u201cat your own risk\u201d. The Town is waiting for the State to finalize the current contract and transfer responsibility for maintenance of the trail over to the Town, which is expected in September 2025. Please stay tuned for periodic updates \u2013 a GRAND OPENING is expected later this summer or early fall. <a href=\"https:\/\/sudbury.ma.us\/pcd\/2024\/02\/14\/bruce-freeman-rail-trail-update-info-2\/\" aria-label=\"Read full article about Bruce Freeman Rail Trail Sudbury Information\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":134,"featured_media":2502,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6,114],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/354"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/users\/134"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/comments?post=354"}],"version-history":[{"count":230,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/354\/revisions"}],"predecessor-version":[{"id":3707,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/posts\/354\/revisions\/3707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/media\/2502"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/media?parent=354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/categories?post=354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/pcd\/wp-json\/wp\/v2\/tags?post=354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}