{"id":2442,"date":"2020-08-03T15:00:55","date_gmt":"2020-08-03T19:00:55","guid":{"rendered":"https:\/\/sudbury.ma.us\/planning\/?p=2442"},"modified":"2021-02-15T07:31:34","modified_gmt":"2021-02-15T12:31:34","slug":"eversource-mass-central-rail-trail-stormwater-management-application","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/planning\/2020\/08\/03\/eversource-mass-central-rail-trail-stormwater-management-application\/","title":{"rendered":"Eversource &amp; Mass Central Rail Trail Stormwater Management Application"},"content":{"rendered":"<p>Co-applicants, NSTAR Electric Company d\/b\/a Eversource Energy (\u201cEversource\u201d) and the Massachusetts Department of Conservation (\u201cDCR\u201d), have filed an application for a Major Stormwater Management Permit for construction of the Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail Project. The Project includes construction of a new 115-kV underground transmission line and a multi-use path within an existing inactive railroad right-of-way, which will require removal of the existing rails and ties; vegetation clearing; grading; installation of the underground transmission line, duct bank, and manholes; installing a 14-foot-wide gravel base; paving of the 10-foot-wide rail trail; installation of stormwater management features; and site restoration.<\/p>\n<p>Along the 4.3\u2011mile length in Sudbury, the Project will disturb approximately 643,985 square feet (14.8 acres),&nbsp;including&nbsp;221,410&nbsp;square feet on slopes greater than 10 percent,&nbsp;within an approximate 2,367,103 square feet (54.4 acres) Project Locus (the MBTA right-of-way). The&nbsp;increase in impervious surface associated with the Project for the paved multi-use path is approximately 226,556 square feet.<\/p>\n<p>In accordance with the provisions of Article V(F). Stormwater Management, Section 5.C, of the Town of Sudbury General Bylaw the Sudbury Planning Board held a public hearing on <span style=\"text-decoration: underline\"><strong>August 12, 2020 at 7:00 PM as a virtual meeting<\/strong><\/span>. More information may be found on the Planning Board Meeting page at&nbsp;<a href=\"https:\/\/sudbury.ma.us\/planning\/meetings\/\">sudbury.ma.us\/planning\/meetings\/<\/a>.<\/p>\n<p><span style=\"text-decoration: underline\"><strong>The application and associated materials are found below.<\/strong><\/span><\/p>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/328\/2020\/07\/Eversource-SWM-Permit-Public-Hearing-Notice-Final.docx_.pdf?version=87de34ee8b96014d16723a34d0ff7b3e\"><strong>Planning Board Public Hearing Notice, August 12, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/07\/Compiled-Sudbury-Stormwater-Permit-Application.pdf?version=9e8222c3d2af8bc20eb8ae4129c5b624\"><strong>Stormwater Management Permit Application Package<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/328\/2020\/07\/Eversource-Sudbury-Stormwater-Permit-Plans.pdf?version=b0041c39e79432fc54e9428229bb6c58\"><strong>Eversource Project Plans<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/328\/2020\/07\/DCR-MCRTWayside_SudStormwater_Plans.pdf?version=59bb36bc9f556a5baeffd0d270cfe9bc\"><strong>Mass Central Rail Trail Plans<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/328\/2020\/07\/ApplicationforMajorSWPermit_7-22-2020_Page1.pdf?version=d532358a909823cdc1c08df20480f260\"><strong>Revised Cover Sheet for Stormwater Application<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/s3-us-west-2.amazonaws.com\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/328\/2020\/07\/Applicant-Information.pdf?version=24f901ab503d6e42ced37832f8e996a9\"><strong style=\"font-size: 1rem\">Project C<\/strong><strong>ontact Informati<\/strong><strong>on<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/07\/FINAL-BETA-Stormwater-RTC-July-30-2020.pdf?version=9c05240b90074475efe6b8e3dc64b4ff\"><strong>Applicant\u2019s Response to Stormwater Comments from BETA Peer Review, July 30, 2020<\/strong><\/a><\/p>\n<p><strong><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/SudtoHud_MCRT_Planning-Board-Presentation_08-12-2020.pdf?version=24a2114fb9c8d65949d7339873ca3ff8\">Planning Board Meeting Slides, August 12, 2020<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Horsely-Witten-Peer-Review-Eversource-Rail-Trail-200918.pdf?version=e577c1e2992cc8dbeb82777e5d5cac9c\">Horsley Witten Peer Review &#8211; Eversource Rail Trail, September 18, 2020<\/a><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Response-to-HW-Comments-201021.pdf?version=abb6e01457dd4c940d662498fe813930\"><strong>Applicant\u2019s Response to Horsley Witten Peer Review \u2013 Eversource Rail Trail, October 21, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Attachment-A-Eversource-Sudbury-Stormwater-Plans-201021-R.pdf?version=d3c6f2f6ca8ce70a4eda9bbb30f11a25\"><strong>Attachment A \u2013 Plans Eversource<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Response-Comments-Sudbury-Hudson-Transmission-Line-Attachment-A-DCR_Sudbury-Stormwater-Plans-201021.pdf?version=093f0e606ed65d2210156ce9bec8393c\"><strong>Attachment A \u2013 Plans DCR Rail Trail<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Attachment-B-Sudbury-STORMWATER-REPORT-201021-R1.pdf?version=02b3cfef86e2a8497a8e2c14f29a1308\"><strong>Attachment B \u2013 Stormwater Report<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Attachment-C-OM-and-LTPPP-201014.pdf?version=4b3136164928bf98bdef0fdb083e5a18\"><strong>Attachment C \u2013 Operation &amp;Maintenance Plan (O &amp; M) and Long Term Pollution Prevention Plan (LTPPP)<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Attachment-D-SWPPP-Form-201021.pdf?version=1e23d646a9582e7a8d811feb9c92aa91\"><strong>Attachment D \u2013 Stormwater Pollution Prevention Plan (SWPPP)<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-MEMO-Stand-Alone-Eversource-Project-Stormwater-Standard-Compliance-201110.pdf?version=799fdfe4825095e5a1166a5a2da446e7\"><strong>VHB Memo on Standards Compliance, November 10, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/VHB-Peer-Review-Stormwater-Memorandum_Five-Watersheds-201110.pdf?version=333bd43b0d5e9f2fc619fe75d3513361\"><strong>VHB Memo &#8211; Response to Horsley Witten Peer Review, November 10, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Conservation-Commission-Comments-re-Stormwater-Standards-for-Eversource-201103.pdf?version=e1d2682b31003291bbd0b9017d8e156e\"><strong>November 2, 2020 Conservation Commission Meeting Summary, Lori Capone, November 3, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Horsley-Witten-2nd-Peer-Review-Eversource-Rail-Trail-201123.pdf?version=34ccd2f80a4c20c78f9e06d7f43b68c5\"><strong>Horsley Witten 2nd Peer Review &#8211; Eversource Rail Trail, November 23, 2020&nbsp;<\/strong><\/a><\/p>\n<p><strong><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Supplemental-Submission-20201202_compiled.pdf?version=55f51b5f5f858c12e74e42333310b1f4\">VHB Memo and Revised Plans \u2013 Response to Horsley Witten Peer Review, December 2, 2020<\/a><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Horsley-Witten-Peer-Review-3-Eversource-MCRT-201204.pdf?version=e8e34a26c53c421cd051d3fd56211a49\"><strong>Horsley Witten 3rd Peer Review &#8211; Eversource Rail Trail, December 4, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Eversource-Revised-DCR-SW-Plans-210113.pdf?version=0a6f73fafa4495bfd5230a03854afde0\"><strong>Revised DCR Stormwater Plans, January 13, 2021<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Eversource-Revised-SW-Plans-210113.pdf?version=874e6aa021b9528dfd2abb19a4e8b504\"><strong>Revised Eversource Stormwater Plans, January 13, 2021<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Eversource-MCRT-VHB-Stormwater-Report-Revision-2-201021.pdf?version=e2e23d9af8ad3b012ba9f11e3afe7e50\"><strong>VHB Revised Stormwater Report, October 21, 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Sudbury-Soil-and-Groundwater-Analytical-Memo-200612.pdf?version=bbf38fd6f316b6380fa0df2086b7c289\"><strong>Soil and Groundwater Analytical Memo, June 12, 2020<\/strong><\/a><\/p>\n<p><strong><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Corridor-Management-Plan-for-Massachusetts-Central-Rail-Trail-and-Sudbury-Hudson-Transmission-Reliability-Project-200807.pdf?version=625cf93560492629535ec57a3f895461\">Corridor Management Plan for Massachusetts Central Rail Trail and Sudbury-Hudson Transmission Reliability Project, August 7, 2020<\/a><\/strong><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Mass-Central-Rail-Trail-MCRT-Stormwater-Management-System-Operation-and-Maintenance-Plan-OM-and-Long-Term-Pollution-Prevention-Plan-LTPPP-June-2020.pdf?version=fd8053314102c79339119802726c0732\"><strong>Mass Central Rail Trail (MCRT) Stormwater Management System Operation and Maintenance Plan (O&amp;M) and Long Term Pollution Prevention Plan (LTPPP), June 2020<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Clean-Eversource-MCRT-Draft-Decision-21-01-27.pdf?version=cbc525cd2c667cef300d860bab05c55e\"><strong>Stormwater Management Permit Draft Decision, January 27, 2021<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/sudbury.ma.us\/planning\/wp-content\/uploads\/sites\/328\/2020\/08\/Final-Decision-Eversource-MCRT-SWMP-210127.pdf?version=a71ea33a9e686a76d1e3ba71abbe840d\"><strong>Stormwater Management Permit Final Decision, January 27, 2021<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Co-applicants, NSTAR Electric Company d\/b\/a Eversource Energy (\u201cEversource\u201d) and the Massachusetts Department of Conservation (\u201cDCR\u201d), have filed an application for a Major Stormwater Management Permit for construction of the Sudbury-Hudson Transmission Reliability and Mass Central &hellip; <a href=\"https:\/\/sudbury.ma.us\/planning\/2020\/08\/03\/eversource-mass-central-rail-trail-stormwater-management-application\/\" aria-label=\"Read full article about Eversource &amp; Mass Central Rail Trail Stormwater Management Application\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":48,"featured_media":2469,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6,114],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts\/2442"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/users\/48"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/comments?post=2442"}],"version-history":[{"count":23,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts\/2442\/revisions"}],"predecessor-version":[{"id":2650,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts\/2442\/revisions\/2650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/media\/2469"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/media?parent=2442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/categories?post=2442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/tags?post=2442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}