{"id":5,"date":"2009-08-13T10:27:39","date_gmt":"2009-08-13T10:27:39","guid":{"rendered":"https:\/\/sudbury.ma.us\/planning\/2009\/08\/13\/walkway-construction-projects\/"},"modified":"2009-08-13T10:27:39","modified_gmt":"2009-08-13T10:27:39","slug":"walkway-construction-projects","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/planning\/2009\/08\/13\/walkway-construction-projects\/","title":{"rendered":"Walkway Construction Projects"},"content":{"rendered":"<p>\n\tThere are currently 6&nbsp;petitions for consideration for walkway construction on the priority list:&nbsp;<\/p>\n<ol>\n<li>\n\t\t<span>Nobscot<\/span><span> Road<\/span> (under construction currently)<\/li>\n<li>\n\t\t<span>Peakham Road (#118 to Robert Best Road)<\/span><\/li>\n<li>\n\t\t<span><span><span>North Road<\/span> <\/span><\/span><\/li>\n<li>\n\t\t<span><span>Powder Mill Road<\/span><\/span><\/li>\n<li>\n\t\t<span>Dutton Road<\/span><\/li>\n<li>\n\t\tMarlboro Road<\/li>\n<\/ol>\n<p>\n\t<span>Each walkway will be reviewed&nbsp;based on a matrix of objectives developed by&nbsp;the 2000 Report of the Walkway Committee. Other factors for determining priorities will include the ability to construct the walkway within the town right-of-way, or within previously granted easements, and the costs.<span>&nbsp; The&nbsp;<a href=\"\/documents\/download.asp?id=4888\">Walkway Planning Priorities<\/a><\/span><\/span><span>&nbsp;contains all criteria used in making the recommendations.<\/span><\/p>\n<p class=\"MsoNormal\">\n\t<span>Additional funds will be&nbsp;needed to continue walkway construction after 2009 funds are expended. Future funding requests will&nbsp;be submitted at&nbsp;the 2010 Annual Town Meeting to continue the program<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There are currently 6&nbsp;petitions for consideration for walkway construction on the priority list:&nbsp; Nobscot Road (under construction currently) Peakham Road (#118 to Robert Best Road) North Road Powder Mill Road Dutton Road Marlboro Road Each &hellip; <a href=\"https:\/\/sudbury.ma.us\/planning\/2009\/08\/13\/walkway-construction-projects\/\" aria-label=\"Read full article about Walkway Construction Projects\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts\/5"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":0,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/posts\/5\/revisions"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/media?parent=5"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/categories?post=5"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/planning\/wp-json\/wp\/v2\/tags?post=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}