{"id":21,"date":"2007-03-29T17:17:00","date_gmt":"2007-03-29T17:17:00","guid":{"rendered":"https:\/\/sudbury.ma.us\/railtrail\/blog\/faq\/03-is-it-feasible-to-construct-a-rail-trail-on-the-old-rail-bed\/"},"modified":"2007-03-29T17:17:00","modified_gmt":"2007-03-29T17:17:00","slug":"03-is-it-feasible-to-construct-a-rail-trail-on-the-old-rail-bed","status":"publish","type":"faq","link":"https:\/\/sudbury.ma.us\/railtrail\/faq\/03-is-it-feasible-to-construct-a-rail-trail-on-the-old-rail-bed\/","title":{"rendered":"03 &#8211; Is it feasible to construct a rail trail on the old rail bed?"},"content":{"rendered":"<p>A feasibility study of the Sudbury to Lowell rail trail was done in 1987 by a state agency and the study said that a rail trail is feasible.  The same state agency released a feasibility study of CSX-owned rail bed in October 2006. The study said that a rail trail is also feasible on this section.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A feasibility study of the Sudbury to Lowell rail trail was done in 1987 by a state agency and the study said that a rail trail is feasible. The same state agency released a feasibility &hellip; <a href=\"https:\/\/sudbury.ma.us\/railtrail\/faq\/03-is-it-feasible-to-construct-a-rail-trail-on-the-old-rail-bed\/\" aria-label=\"Read full article about 03 &#8211; Is it feasible to construct a rail trail on the old rail bed?\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"template":"","meta":{"inline_featured_image":false},"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs\/21"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs"}],"about":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/types\/faq"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media?parent=21"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}