{"id":47,"date":"2007-03-29T17:21:00","date_gmt":"2007-03-29T17:21:00","guid":{"rendered":"https:\/\/sudbury.ma.us\/railtrail\/blog\/faq\/07-has-construction-started-on-the-rail-trail-south-of-route-20\/"},"modified":"2007-03-29T17:21:00","modified_gmt":"2007-03-29T17:21:00","slug":"07-has-construction-started-on-the-rail-trail-south-of-route-20","status":"publish","type":"faq","link":"https:\/\/sudbury.ma.us\/railtrail\/faq\/07-has-construction-started-on-the-rail-trail-south-of-route-20\/","title":{"rendered":"07 &#8211; Has construction started on the rail trail south of Route 20?"},"content":{"rendered":"<p>No.  CSX has removed the rails and ties from the Mass. Central crossing south to Route 9.  With the recent rise in scrap metal prices, the rails have become valuable.  Removal of the rails and ties that has occurred is not related to any rail-trail construction plans.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>No. CSX has removed the rails and ties from the Mass. Central crossing south to Route 9. With the recent rise in scrap metal prices, the rails have become valuable. Removal of the rails and &hellip; <a href=\"https:\/\/sudbury.ma.us\/railtrail\/faq\/07-has-construction-started-on-the-rail-trail-south-of-route-20\/\" aria-label=\"Read full article about 07 &#8211; Has construction started on the rail trail south of Route 20?\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"template":"","meta":{"inline_featured_image":false},"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs\/47"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs"}],"about":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/types\/faq"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media?parent=47"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}