{"id":53,"date":"2007-03-29T17:48:00","date_gmt":"2007-03-29T17:48:00","guid":{"rendered":"https:\/\/sudbury.ma.us\/railtrail\/blog\/faq\/05-how-much-money-has-the-town-of-sudbury-spent-in-studying-the-rail-trail\/"},"modified":"2007-03-29T17:48:00","modified_gmt":"2007-03-29T17:48:00","slug":"05-how-much-money-has-the-town-of-sudbury-spent-in-studying-the-rail-trail","status":"publish","type":"faq","link":"https:\/\/sudbury.ma.us\/railtrail\/faq\/05-how-much-money-has-the-town-of-sudbury-spent-in-studying-the-rail-trail\/","title":{"rendered":"05 &#8211; How much money has the Town of Sudbury spent in studying the rail trail?"},"content":{"rendered":"<p><FONT size=2><br \/>\n<P>The preliminary engineering and environmental assessment cost $25,000 and was funded at 2005 Sudbury Town Meeting through the CPA. At the 2007 Sudbury Town Meeting, the Town authorized spending an additional $15,000 to verify EOT&#8217;s title to the right of way north of Crumble Station, $25,000 for a four season wildlife study of the corridor, and $105,000 for a center-line survey and wetlands delineation of the corridor. Only $39,900 has been spent on the survey\/delineation; if the Town deems this project has been successfully completed, the unspent remainder will be returned to the CPC for re-allocation.<\/P><br \/>\n<P>Additionally, at 2008 Sudbury Town Meeting, the Town authorized spending $420,000 of CPA funds to acquire the CSXT-owned right of way.<\/P><\/FONT><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The preliminary engineering and environmental assessment cost $25,000 and was funded at 2005 Sudbury Town Meeting through the CPA. At the 2007 Sudbury Town Meeting, the Town authorized spending an additional $15,000 to verify EOT&#8217;s &hellip; <a href=\"https:\/\/sudbury.ma.us\/railtrail\/faq\/05-how-much-money-has-the-town-of-sudbury-spent-in-studying-the-rail-trail\/\" aria-label=\"Read full article about 05 &#8211; How much money has the Town of Sudbury spent in studying the rail trail?\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"template":"","meta":{"inline_featured_image":false},"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs\/53"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs"}],"about":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/types\/faq"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media?parent=53"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}