{"id":59,"date":"2007-03-29T17:53:00","date_gmt":"2007-03-29T17:53:00","guid":{"rendered":"https:\/\/sudbury.ma.us\/railtrail\/blog\/faq\/11-what-if-the-trail-conversion-is-done-entirely-with-sudbury-funds\/"},"modified":"2007-03-29T17:53:00","modified_gmt":"2007-03-29T17:53:00","slug":"11-what-if-the-trail-conversion-is-done-entirely-with-sudbury-funds","status":"publish","type":"faq","link":"https:\/\/sudbury.ma.us\/railtrail\/faq\/11-what-if-the-trail-conversion-is-done-entirely-with-sudbury-funds\/","title":{"rendered":"11 &#8211; What if the trail conversion is done entirely with Sudbury funds?"},"content":{"rendered":"<p>The Town would need to gain access to the rail bed through purchase (as with the CSXT right of way) or lease. A lease from EOT may constrain the type of rail trail that is built. If the Town funds the entire project, all decisions would be made locally.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Town would need to gain access to the rail bed through purchase (as with the CSXT right of way) or lease. A lease from EOT may constrain the type of rail trail that is &hellip; <a href=\"https:\/\/sudbury.ma.us\/railtrail\/faq\/11-what-if-the-trail-conversion-is-done-entirely-with-sudbury-funds\/\" aria-label=\"Read full article about 11 &#8211; What if the trail conversion is done entirely with Sudbury funds?\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"template":"","meta":{"inline_featured_image":false},"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs\/59"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/faqs"}],"about":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/types\/faq"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media?parent=59"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}