{"id":218,"date":"2015-08-25T18:55:00","date_gmt":"2014-08-19T19:15:19","guid":{"rendered":"https:\/\/sudbury.ma.us\/wp-content\/uploads\/sites\/334\/2014\/08\/Lowell-Sudbury.pdf"},"modified":"2015-10-14T13:41:46","modified_gmt":"2015-10-14T17:41:46","slug":"lowell-sudbury-bicycle-path-feasibility-study-1987","status":"inherit","type":"attachment","link":"https:\/\/sudbury.ma.us\/railtrail\/lowell-sudbury-bicycle-path-feasibility-study-1987\/","title":{"rendered":"Rail Trail Lowell-Sudbury Bicycle Path Feasibility Study [1987]"},"author":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false},"description":{"rendered":"<p class=\"attachment\"><a href='https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/334\/2014\/08\/Lowell-Sudbury.pdf?version=8cded5f6af6e3db4ce381b1a2af05a11'>Rail Trail Lowell-Sudbury Bicycle Path Feasibility Study [1987]<\/a><\/p>\n<p>The Central Transportation Planning Staff (CTPS), the Metropolitan Area Planning Council (MAPC), and the Northern Middlesex Area Commission (NMAC) were commissioned to do a feasibility study to determine whether the railroad right-of-way running from near Route 20 in Sudbury to Route 3 in Lowell could be converted into a bicycle\/hiking trail.<\/p>\n"},"caption":{"rendered":"<p>Rail Trail Lowell-Sudbury Bicycle Path Feasibility Study [1987] The Central Transportation Planning Staff (CTPS), the Metropolitan Area Planning Council (MAPC), and the Northern Middlesex Area Commission (NMAC) were commissioned to do a feasibility study to &hellip; <a href=\"https:\/\/sudbury.ma.us\/railtrail\/lowell-sudbury-bicycle-path-feasibility-study-1987\/\" aria-label=\"Read full article about Rail Trail Lowell-Sudbury Bicycle Path Feasibility Study [1987]\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n"},"alt_text":"","media_type":"file","mime_type":"application\/pdf","media_details":{},"post":null,"source_url":"https:\/\/cdn.sudbury.ma.us\/wp-content\/uploads\/sites\/334\/2014\/08\/Lowell-Sudbury.pdf?version=8cded5f6af6e3db4ce381b1a2af05a11","_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media\/218"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/media"}],"about":[{"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/types\/attachment"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/railtrail\/wp-json\/wp\/v2\/comments?post=218"}]}}