{"id":472,"date":"2023-10-04T15:03:04","date_gmt":"2023-10-04T19:03:04","guid":{"rendered":"https:\/\/sudbury.ma.us\/transferstation\/?p=472"},"modified":"2023-10-04T15:03:04","modified_gmt":"2023-10-04T19:03:04","slug":"roadway-preservation-to-begin-october-5-2023","status":"public-archive","type":"post","link":"https:\/\/sudbury.ma.us\/transferstation\/2023\/10\/04\/roadway-preservation-to-begin-october-5-2023\/","title":{"rendered":"Roadway Preservation to begin October 5, 2023"},"content":{"rendered":"<p>Fall 2023 Roadway Preservation to start October 5, 2023.&nbsp; See the attached schedule for specific roads.<\/p>\n<p>&nbsp;<\/p>\n<table style=\"width: 206.667%;height: 228px\" width=\"257\">\n<tbody>\n<tr>\n<td width=\"257\">CRACK SEALING<\/td>\n<\/tr>\n<tr>\n<td>Cracks of an existing pavement surface are sealed to prevent excess water and moisture from penetrating the asphalt.<\/td>\n<\/tr>\n<tr>\n<td>What to expect<\/td>\n<\/tr>\n<tr>\n<td>&#8211; Crack Sealing is noisy but progresses at a steady pace.<\/td>\n<\/tr>\n<tr>\n<td>&#8211; 2-lane closure may be necessary as it will result in a faster dry time, allow the road to be&nbsp;&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>&nbsp;&nbsp; completed in one pass and prevents possible damage to car tires.&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>Note:&nbsp; Streets are subject to change based upon degree of cracking and budget.&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>If you have any questions, please contact the Public Works Office (8:00 AM &#8211; 3:30 PM) at (978) 440-5421.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Fall 2023 Roadway Preservation to start October 5, 2023.&nbsp; See the attached schedule for specific roads. &nbsp; CRACK SEALING Cracks of an existing pavement surface are sealed to prevent excess water and moisture from penetrating &hellip; <a href=\"https:\/\/sudbury.ma.us\/transferstation\/2023\/10\/04\/roadway-preservation-to-begin-october-5-2023\/\" aria-label=\"Read full article about Roadway Preservation to begin October 5, 2023\">Read full article<span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":124,"featured_media":474,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1,6],"tags":[],"_links":{"self":[{"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/posts\/472"}],"collection":[{"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/users\/124"}],"replies":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/comments?post=472"}],"version-history":[{"count":1,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/posts\/472\/revisions"}],"predecessor-version":[{"id":475,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/posts\/472\/revisions\/475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/media\/474"}],"wp:attachment":[{"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/media?parent=472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/categories?post=472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sudbury.ma.us\/transferstation\/wp-json\/wp\/v2\/tags?post=472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}