IFB – Audio Visual Work at Fairbank Community Center

Published October 12, 2023 | Facilities Department | Updated October 26, 2023 | Automatically Archived on 11/2/2023

This Post has been archived and its content might be outdated. If you are looking for recent content, please check this Department's Homepage.

Pursuant to the provisions of M.G.L. Chapter 30B ยง 5, the Town of Sudbury invites electronic bids for the Audio Visual Package at the Fairbank Community Center, 40 Fairbank Road, Sudbury, MA until the time specified below at which time the bids will be opened and read. The work includes audio visual equipment, related construction services, cabling, and integration of the equipment. Construction services scope within this project providing cabling, wiring, and installing and attaching equipment to the building structure and finish, associated programming, user interface coordination, user training and closeout documents. The Fairbank Community Center is currently under construction that includes wiring and cabling to audio visual locations, blocking to support equipment, and labeling of cabling at the terminations. It is anticipated that the base building scope will be Substantially Complete prior to the Audio Visual package installation.
All project documents, including specifications and bid forms, will be electronically distributed by the Town of Sudbury Facilities Department on October 11, 2023 starting at 9AM. Send request to:
facilities@sudbury.ma.us

Please follow this link to download the drawings:
https://app.box.com/s/d3xfxnp5050n4kff9mpgxkshin7u0686

Attachments