11 – What if the trail conversion is done entirely with Sudbury funds?
11 – What if the trail conversion is done entirely with Sudbury funds?
Answer |
The Town would need to gain access to the rail bed through purchase (as with the CSXT right of way) or lease. A lease from EOT may constrain the type of rail trail that is built. If the Town funds the entire project, all decisions would be made locally. |