11 – What if the trail conversion is done entirely with Sudbury funds?

Answer

The Town would need to gain access to the rail bed through purchase (as with the CSXT right of way) or lease. A lease from EOT may constrain the type of rail trail that is built. If the Town funds the entire project, all decisions would be made locally.