01 – What are the usual steps in the process of building a rail trail?

Answer

 

  • A railroad bed is no longer in active use and the potential for a rail trail is identified
  • A feasibility study done by the state
  • A series of local actions to approve the exploration of the possibility of a rail trail
  • A preliminary engineering study to identify critical aspects of the trail and estimate costs
  • Obtaining rights to the rail bed through purchase or lease
  • Determining the form, function, and funding of the tra
  • Designing and permitting the trail.
  • Bidding and construction.