Skip to Content

Addendum 1 – Floor Tile Replacement Fairbank Center

Published

November 17, 2010

| Building Department
| Automatically Archived on 11/24/2010

This Post has been archived and its content might be outdated. If you are looking for recent content, please check this Department's Homepage.

 

INVITATION TO BID

Floor Tile Replacement, Including Removal of Asbestos-Containing Existing Tile

 Fairbank Community Center

40 Fairbank Road, Sudbury, MA 01776

ADDENDUM NO. 1

 I.  The contract documents are changed as follows:

 All references to the inclusion of the Asbestos Abatement Project Monitor and clearance sampling in the bid documents, wherever found, are hereby deleted and shall be disregarded by the contractor.   Asbestos abatement monitoring and clearance sampling will be performed by the Owner and the cost for these services shall not be included in the bid.  

 II.  Responses to contractor questions from the walkthrough occurring on November 15, 2010. 

 a)  Pool tables are to remain in the room and be placed on wheels for ease of movement by the contractor.

 b)  Bid documents require mastic (adhesive) to be removed.

 c)  Park and Recreation Office will be unoccupied for 3 days to allow for floor removal in the large hallway.

 III.  This addendum does not affect the original bid date, bid time or bid place.

 BIDDERS ARE INSTRUCTED TO NOTE THIS ADDENDUM ON THE BID FORM.

 DATED:   November 17, 2010