Eversource Transmission Line Project Information

On February 2, 2016 Eversource Energy made a presentation before the Sudbury Board of Selectmen to introduce the Sudbury to Hudson Transmission Reliability Project. The project proposes to install a 115-kV transmission line through areas of Hudson and Sudbury and smaller sections of Marlborough and Stow. Below are links to resources that those wishing to learn more about the project and Sudbury’s response may find useful.

Please click here to sign up for email notifications regarding the Eversource project.

 

Update 8/24/20: Town of Sudbury Appeals Status

The town of Sudbuy is currently appealing three issues pertaining to the Eversource Transmission Line project: SJC Land Court Case, EFSB Decision and MEPA Certificate. Please see below for details.

  1. Supreme Judicial Court (SJC) Land Court Appeal
    • TOWN OF SUDBURY V. MASSACHUSETTS BAY TRANSPORTATION AUTHORITY (MBTA) AND NSTAR ELECTRIC COMPANY DBA EVERSOURCE ENERGY. No. SJC-12738
    • Appeal of the Land Court judgment alleging that the MBTA violated Massachusetts prior public use doctrine, which precludes land taken for a particular public use to be diverted to an inconsistent public use without plain and explicit authorizing legislation. Oral arguments before the SJC were held on October 1, 2019. On April 29, 2020 the SJC waived its 130 day rule, giving itself more time to issue a decision.
    • Oral Argument Video
    • SJC Docket Information
    • Town of Sudbury Reply Brief 5/21/2019
  2. Energy Facilities Siting Board (EFSB) Appeal
    • TOWN OF SUDBURY v. ENERGY FACILITIES SITING BOARD
    • Appeal of the December 18, 2019 EFSB decision to approve the Eversource Transmission Line project. In July 2020, a joint motion was entered to consolidate the Town of Sudbury’s appeal (SJ-2020-0026) with Protect Sudbury’s appeal (SJ-2020-0029). The Town’s appeal alleges the EFSB committed errors of law, that the EFSB’s decision to approve the project is unwarranted by facts on the record, and that the Siting Board “erroneously determined that subject to its required conditions, the Project is necessary for the purpose alleged, and will serve the public convenience, and is consistent with the public interest.” Oral arguments have not yet been scheduled.
    • SJC Docket Information
    • Town of Sudbury Petition for Appeal 1/27/20
  3. Massachusetts Environmental Policy Act Office (MEPA) Certificate Appeal
    • TOWN OF SUDBURY V. KATHLEEN THEOHARDIES, IN HER CAPACITY AS SECRETARY OF THE EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS, AND NSTAR ELECTRIC COMPANY DBA EVERSOURCE ENERGY SUFFOLK SUPERIOR COURT
    • Appeal of the MEPA Certificate granted for the Final Environmental Impact Report (FEIR) filed for the Eversource Transmission Line project.
    • Superior Court Docket Information
      1. Court Department = The Superior Court
      2. Court Division = Suffolk County Civil
      3. Case Number = 2084CV00151

    • Town of Sudbury Judicial Review Request 1/17/20

 

Update 8/2/20: Eversource & Mass Central Rail Trail Stormwater Management Application

NSTAR Electric Company d/b/a Eversource Energy (“Eversource”) and the Massachusetts Department of Conservation (“DCR”), have filed an application with the Planning Board for a Major Stormwater Management Permit for construction of the Sudbury-Hudson Transmission Reliability and Mass Central Rail Trail Project. The Project includes construction of a new 115-kV underground transmission line and a multi-use path within an existing inactive railroad right-of-way, which will require removal of the existing rails and ties; vegetation clearing; grading; installation of the underground transmission line, duct bank, and manholes; installing a 14-foot-wide gravel base; paving of the 10-foot-wide rail trail; installation of stormwater management features; and site restoration. The Sudbury Planning Board will hold a public hearing on August 12, 2020 at 7:00 PM as a virtual meeting.

For more details and application materials, please visit https://sudbury.ma.us/planning/?p=2442

 

Correspondence

Bolton Conservation Commission Letter of Support (June 10, 2019)

Town Response to Final Impact Environmental Report (September 7, 2018)

Notification of Soil Borings & Test Pitting on MBTA ROW (August 27, 2018)

Email Regarding Final Environmental Impact Report (July 30, 2018)

Letter Regarding MAPC Meeting on Mass Central Rail Trail (July 31, 2017)

Notification Regarding Field Activities (June 20, 2017)

U.S. Fish and Wildlife Service Letter (June 14, 2017) 

Right of Way Spring Aerial Helicopter Patrols from Eversource   (May 17, 2017)

Protect Sudbury Response From MassDOT  (April 4, 2017)

Senator Elizabeth Warren, Congresswoman Katherine Clark and Congresswoman Niki Tsongas Eversource Concerns Letter (October 18, 2016)

Organization for the Assabet River (OARS) Letter (September 6, 2016)

Friends of the Assabet River National Wildlife Refuge Letter (August 14, 2016)

Survey Work Continuation Notification (July 11, 2016)

Town Manager Letter to Joint Committee on Telecommunications, Utilities and Energy Chairmen (June 20, 2016)

Survey Work Continuation Notification (June 14, 2016)

Board of Selectmen Letter to Energy & Environmental Affairs Sec. (May 24, 2016)

Eversource FAQ (May 11, 2016- UPDATED June 2, 2016)

Eversource Notification of Survey Work  (May 2, 2016- UPDATED May 3, 2016)

Senator Eldridge, Representative Hogan and Rep Gentile Letter (March 25, 2016)

Governor Baker Office Letter (March 18, 2016)

Board of Selectmen Letter (March 25, 2016)

Board of Selectmen Letter (March 17, 2016)

Town Manager Letter (March 14, 2016)

Conservation Commission Letter (March 15, 2015)

Historic Districts Commission Letter (March 14, 2016)

Historical Society Letter (March 18, 2016)

 

Litigation

Complaint for Declaratory Judgment and Injunctive Relief_MBTA (September 27, 2017)

Sudbury Petition to Intervene (June 15, 2017)

Eversource Petition to Construct Transmission Line – EFSB Hearing Notice (May 25, 2017)

 

Meetings

Notice of Intent Hearing information and documentation filed with the Conservation Commission (March 2020 – Present)

MEPA Scoping Session (June 12, 2017)

Commonwealth of Massachusetts Energy Facilities Siting Board – Public Hearing (May 25, 2017)

Board of Selectmen Meeting with Presentation from Eversource (October 26, 2016)

Eversource Meeting with Town staff (April 5, 2016)

Eversource Discussion Excerpt from Feb 2, 2016 Board of Selectmen Meeting

Open House Postcard (March 16, 2016)

Memo From Selectman Simon (Re: 3/7/16 Town of Hudson Board Meeting)

 

Presentations

Presentation by Eversource to Board of Selectmen on 10/26/16

Routing and Design Re-Evaluation Results to Board of Selectmen at 09/06/16 Meeting.

Presentation by Eversource to Board of Selectmen at 02/02/16 Meeting. (Revised 3/24/16)

Presentation by Protect Sudbury to Board of Selectmen on 03/08/16

 

Press Releases

Sudbury Files Suit Against MBTA (September 28, 2017)

Developments Continue in Sudbury’s Fight against Eversource (April 13, 2017)

OARS Raises News Concerns about ‘Ecologically Damaging’ Eversource Project Press Release (October 17, 2016)

Eversource Project an “Exorbitant” Financial Burden Press Release (August 2, 2016)

Selectmen “Deeply Concerned” About Eversource Herbicide Use Press Release (June 16, 2016)

Board of Selectmen Press Release (April 7, 2016)

Board of Selectmen Press Release (April 1, 2016)

Sudbury Stands Together Press Release (March 18, 2016)

 

Reports

MEPA Final Environmental Impact Report filed by VHB on behalf of Eversource (July 2, 2018)

1966 Underground Power Lines Study (introduction from League of Women Voters)

 

Web Resources

ISO-New England website (non-profit organization that issued report citing deficiencies in electric system)

Email Signup (please click to sign up to receive updates regarding the Eversource project from the Town Manager)

 

Email this Post
Content Shortlink
Back to Selectmen's Office